Categories | Steel Structure Warehouse |
---|---|
Brand Name: | Hongye |
Model Number: | 0336 |
Certification: | ISO9001:2000 |
Place of Origin: | Guangdong, China (Mainland) |
MOQ: | 500 square meters |
Price: | Negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 5,000 Tons per month |
Delivery Time: | 25~35 days after received your payment |
Packaging Details: | All materials will be packed to the big pallet and push into the containers |
Grade: | Q345, Q235 |
Dimensions: | Customized |
Type: | Light |
Feature: | Prefabricated |
Application: | Warehouse |
Surface: | Painted or Galvanized |
Certificates: | ISO9001 |
Standard: | AISI, ASTM, BS, DIN, GB, JIS |
Column / Beam: | H-type steel |
Purlin: | C/Z-type steel |
Fashion design prefabricated light steel structure warehouse from
China
Product Description:
Prefabricated steel structure building is a Green economy building
system, which is formed by the main structure (H-section steel for
beam/column, C channel steel or Z channel steel for purlin),
substructure (Round steel bar or Angle steel for bracing, Round
steel tube for tie bar, Angle steel for angle brace), roof and wall
system (using sandwich panel or single steel sheet), door and
window system. Pre engineered steel structure building building is
widely used as warehouse, workshop, hangar, shed, etc..
Specification:
Main structure | H-section steel | Q345 steel H beam, Box column is also available |
Welding | Automatic Submerged Arc Welding | |
Rust removing | Shot blasting | |
surface processing | twice primer and twice finish Alkyd Paint or hot dip galvanized | |
High strength bolt | Grade 10.9 | |
Substructure | Angle brace | L50x4,Steel Q235,Process and painting |
Cross bracing | Dia.20 round bar,Steel Q235, process and pre-galvanized | |
Tie bar | Dia.89*3 round pipe,Steel Q235 Process and painting or pre-galvanized | |
Batter brace | Dia.12 round bar,Steel Q235 process and pre-galvanized | |
Ordinary bolt | Galvanized bolt | |
Roof | Purlin | C channel or Z channel,steel Q235, galvanized |
Roof panel | (50mm, 75mm, 100mm, 150mm) Sandwich panel or corrugated GI color steel sheet | |
Transparent skylight | 1.2mm FRP | |
Accessories | Sealant, self-tapping screw, etc. | |
Edge cover | Made of color steel sheet | |
Gutter | Made of steel sheet thickness 0.8mm, or PVC | |
Rinspout | PVC pipe | |
Wall | Purlin | C channel or Z channel, steel Q235, galvanized |
Wall panel | (50mm, 75mm, 100mm, 150mm) Sandwich panel or (0.4mm, 0.5mm, 0.6mm, 0.7mm) corrugated GI color steel sheet | |
Accessories | Sealant, self-tapping screw etc | |
Edge cover | Made of GI color steel | |
Ventilator | unpowered axial-flow ventilator or monitor roof | |
Door & window | Electric rolling door/sliding door, PVC/Alu. alloy window | |
Crane | With or without crane, ranging from 5 tons to 20 tons |
Advantages:
1. Light weight, high strength, 50years durable use, no
construction waste.
2. Cost considering: Time saved, cost saved;
3. Easy move, materials can be recycled used, environmentally;
4. Used widely, used as factory, warehouse, office building,
aircraft hangar etc;
5. Structural durabilities, easy maintenance.
Our Company
Our team continues to improve the standards themselves, and we have
to build a first-class quality, first-class benefits, first-class
modern enterprise management as the goal, We are committed to the
development of new energy-saving products, with independent
intellectual property patents production technology, the
introduction of German technology imported main material adhering
to the "committed to being respected and have capacity for
sustainable development of enterprises" for enterprise vision.
Adhere to the "promotion of industrial innovation and circulation
of the intensive use of social resources" for enterprise mission,
continuous innovation, promote the building decoration industry to
a green, low carbon, health, environmental protection, energy
saving direction.
Our Equipment:
12 sets of production lines for welded H beam , annual output is
60000 tons
3 sets of production lines for C section steel , yearly output is
1000 tons
3 sets of production lines for Z section steel, annual output is
10000 tons.
2 sets of production lines for Color coated corrugated steel
sheets, annual output is 5000 tons.
2 sets of production lines for sandwich panels, annual capacity is
1500000 M2.
4 sets of CNC plane drilling machines.
3 sets of Sand blasting machines.
3 sets of Straightening machines.
![]() |