Plastic PE Pipe HDPE Tube Extrusion Extrusion Machine PE Large Pipe Making Machine Production Line

Price Negotiable
Price: negotiation
MOQ: 1 SET
Delivery Time: 45 WORKING DAYS
Brand: LB
Product Description

Plastic PE Pipe HDPE Tube Extrusion Extrusion Machine PE Large Pipe Making Machine Production Line

 

APPLICATION:

Double inverter,the wire tension is adjusted automatic Nil-pulley design, high effeciency Save energy from 20% to 25% compared with tranditional machine Use import componets to keep the quality.

Our PE Pipe Extrusion Production Line is designed for manufacturing high-quality HDPE (High-Density Polyethylene) and PE (Polyethylene) pipes in various diameters, including large-scale pipes for industrial, agricultural, and municipal applications. This advanced extrusion line ensures high precision, durability, and energy efficiency, making it ideal for producing pipes used in water supply, drainage, gas distribution, and irrigation systems.

 

PE PIPE PRODUCTION SPECIFICATIONS:

Model Pipe diameter Extruder Extruder power Capacity
LB-63 20-63 SJ65/33 55AC 150
LB-110 20-110 SJ65/33 55AC 150
LB-160 75-160 SJ75/33 90AC 280
LB-250 90-250 SJ75/33 110DC 350
LB-315 110-315 SJ90/33 160DC 450
LB-450 160-450 SJ90/33 160DC 450
LB-630 315-630 SJ120/33 280DC 850
LB-800 500-800 SJ150/33 315DC 1100
LB-1200 710-1200 SJ150/34 400DC 1350

 

 

Technological processes

[Feeding&Drying] → [Extrusion Molding] → [Mold Shaping] → [Cooling] → [Traction and Cutting] → [Marking]

Material Feeding & Drying

High-quality PE resin (HDPE/MDPE) is loaded into the hopper, then dried (if necessary) to remove moisture for optimal extrusion.

 

Extrusion & Melting

The material is fed into the extruder barrel, where a rotating screw heats and melts it (160–220°C) into a homogeneous molten state.

 

Pipe Formation

The molten PE is forced through a die head, shaping it into a continuous pipe with precise diameter and wall thickness.

 

Cooling & Sizing

The pipe enters a vacuum calibration tank for rapid cooling and dimensional stabilization, ensuring consistent size and roundness.

 

Hauling & Cutting

Pullers grip the pipe, maintaining tension while it’s cut to specified lengths by an automatic saw.

 

Inspection & Stacking

Pipes undergo quality checks (pressure, thickness, surface finish) before being stacked or coiled for packaging.

 

Packaging & Storage

Finished pipes are labeled, packed, and stored for shipment.

 

Advantages:

High-speed extrusion for efficient production

PLC control system for precision operation

Energy-saving design with stable performance

Suitable for HDPE, PE100, PE80, and other polyethylene materials

Customizable for different pipe diameters (from small to large-scale pipes)

 

 

  

 

PRE- AND AFTER-SALE SERVICES

• A great wealth of experience,

• A consistent focus on the highest quality

• A complete twin pipe vacuum sizing system;

• Controlled independently unitary structure twin pipe hauling mechanism and synchronous cutting device;

• Optional length set and accurate adaption stacker.

• A highly motivated team

• Sophisticated process technology

• Customized solutions

 

Our factory

 

Our exhibition

 

Our goods shipping

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang Langbo Machinery Co. Ltd.
Location No.99 LEFENG ROAD, LEYU TOWN, ZHANGJIAGANG, CHINA
Contact Person YIN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.