Machinery Building Material Machinery Steel Frame & Purlin Machines

30m/Min 5.5KW Stud And Track Roll Forming Machine For Galvanized Steel Strip

Price Negotiable
Price: USD 15000~25000 per Set
MOQ: 1 Set
Delivery Time: 30 days
Brand: Lebron-Machinery
Product Description

Over 30 Meters Per Minute High-Speed Stud And Track Forming Machine Full Automatic

 

 

1. Description:

 

Steel Stud & Truss, as an intelligent component of the building system, provides a variety of applications to assemble a sturdy structure easily and quickly.

 

Lebron-Machinery supports a complete production line of customized steel construction solutions for customers, including Batten, Top Hat and Stud/Track. Our high-performance machines are selected by market leaders in Australia, New Zealand, Korea, UK, and the United States, and these machines are known for the best innovation and technology.

 

 

2. Main Technical Parameters

 

No. Item Description
1 Suitable Material Galvanized Steel Strip
2 Thickness 0.6~1.2mm
3 Main Power 5.5KW
4 Roller Station 12 stations
5 Roller Material 45# steel, quenched. Coated with 0.05mm chrome
6 Shaft Material 45# steel, quenched, coated with 0.05mm chrome
7 Shaft diameter 70mm

 

 

3. Workflow:

 

Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving

 

 

4. Main Components

 

No. Name Quantity
1 3-Ton Decoiler 1 Set
2 Feeding Guider 1 Set
3 Roll Forming Machine Unit 1 Set
4 Hydraulic Punching Device 1 Set
5 Hydraulic Servo Tracking Cutting Device 1 Set
6 Hydraulic Station 1 Set
7 Receiving Table 1 Set
8 Electric Control Cabinet 1 Set

 

 

5. Brands of Electrical Appliances

 

No. Name & Brand Brand
1 PLC Germany Siemens
2 Frequency Converter Japan Yaskawa
3 Touch Screen Germany Siemens
4 Encoder Japan Omron
5 Other Electrical Accessories France Schneider

 

 

6. After-Sale Service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Lebron Machinery Technology Co., Ltd.
Location 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Contact Person Alfred

Request A Quote

Please check your email address.
Your message must be at least 20 characters.