Achieve Innovations (Changsha) Co., Ltd.
                                                                                                           
Verified Supplier
8 Years
Since 2018
Menu
Concrete Spreader

HGY36S-4R Concrete Placing Boom 25Ton 30kw

Price Negotiable
Price: $100,000.00 - $110,000.00/Units
MOQ: Negotiable
Delivery Time: Negotiable
Brand: Achieve
Product Description

HGY36S-4R Concrete distributor Concrete Placing Boom

 

The counterbalance valve provides a locking function as an added safety measure.

 

The use of double-wall, wear-resistant delivery pipe has improved the service life up to 30,000-50,000m3.

This is 3-5 times longer than the life of ordinary pipe.

To enhance adaptability, the telescoping supports, designed by Sany, have an independent climbing system to accommodate installation in an elevator shaft or on curved walls of varying dimensions.

Cylinder jacking is used to 'climb' the placing booms within elevator shafts. The use of a fully automatic, 'stepless', lifting climbing frame with double electric hoists improves efficiency and safety by reducing the labor requirements of workers.

 

 

Technical Specifications

Model of Placing Boom

HGY36S-4R

HGY36P-4R

HGY36SC-4R

HGY36PC-4R

 

 

 

Performance

Max. Radius (m)

36

Free Standing Height,Slewing Range

22.7m,400°

Working temperature(℃)

0~60

Counter weight(kg)

/

2930

Total weight(kg)

25000

27930

Supply power to equipment

380V/50Hz

 

Electric motor

Motor Model

Y2-200L-4

Power(kw)

30

 

Hydraulic system

System pressure(MPa)

32

Flow(L/min)

34

47

34

47

Oil tank capacity(L)

280

Control mode

(Cable+Radio) remote control

Clearing mode for concrete pipe

Water clear / Dry clear

Section of tubular column (m×m)

0.75×0.75

 

 

 

 

 

 

Arm(Booms)

Boom model

fully hydraulic foldable arms

Delivery pipeline diameter

DN125mm

Length of end hose 

DN125mm ×3000mm

 

The first section

Length(m)

12.3

Articulation

-2.5°~82.5°

The second section

Length(m)

7.9

Articulation

~180°

 

The third section

Length(m)

7.9

Articulation

~180°

 

The forth section

Length(m)

7.9

Articulation

~180°

 

 

 

 

Climbing

Climbing Mode

Cylinder Jack Lifting

Internal Climbing Step Distance(m)

0.52

Floor Frame

Hole Prepared in Floor

Shaft Frame

Size of Climbing Shaft : 2.0m-2.7m

Min. Space Between Internal Climbing Frame

Climbing(m)

3

Placing Concrete(m)

6

Rest(m)

6

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Achieve Innovations (Changsha) Co., Ltd.
Location 5F, Block 4, Shangming Commercial Center, No. 28, Fuyuan Rd(M), Kaifu District, Changsha, Hunan, P. R. China 410003
Contact Person LIU Xing Zheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.