PVC Celuka Foam Board Extrusion Line with 80/156 Double Screw Extruder | 300-400 kg/h Output | 380V Power

Price Negotiable
Price: USD90000/set - USD110000/set
MOQ: Pvc Celuka Foam Board Extrusion Line 1 set
Delivery Time: Pvc Celuka Foam Board Extrusion Line 40-60 work days
Brand: SHENZHEN HYPET
Product Description
PVC Celuka Foam Board Extrusion Line Overview

High-performance PVC Celuka foam board production line featuring double screw extruder 80/156 configuration, designed for efficient manufacturing of PVC and wood-plastic composite materials.

Technical Advantages
  • Complete formulas and full technology package provided by HYPET
  • High output capacity with stable extrusion process and superior foaming ratio
  • Specialized screw barrel design for PVC and wood-plastic foaming applications
  • Vented structure with bimetal surface coating reduces wear from abrasive materials
  • Extended machine service life through advanced material protection
Standard Configuration
Component Specification
Production Control System Siemens PLC control system
Cooling System Fan cooling cabinet
Main Motor AC motor with premium inverter
Pressure Sensor HYPET individual temperature and pressure control
Core Temperature Control Internal closed loop heat balancing system
Screw & Barrel Material Nitro Alloy with bi-metal construction
Feeding System Standard single screw dosing device
Technical Specifications
Parameter Value
Suitable Materials PVC and wood powder mixed composite
Product Thickness Range 5-20mm
Maximum Output Capacity 300-400 kg/h
Center Height 1,100mm
Overall Dimensions (L×W×H) 22,000 × 2,100 × 2,200mm
Operation Direction Right to left
Operating Requirements
Category Requirement
Power Supply 380V/50Hz, 3P+N+PE, 200kW installation capacity
Cooling Water ≤15°C temperature, ≥0.3MPa pressure, ~15 m³/h flow
Compressed Air ≥0.6MPa pressure, ~0.9 m³/min flow
Environmental Conditions Indoor use, 0-40°C temperature, 55-85% humidity
Product Image
PVC Celuka Foam Board Extrusion Line with double screw extruder showing complete production setup
Payment & Delivery Terms

Payment Options: T/T or irrevocable L/C at sight. 35% advance payment, 65% balance before shipment.

Delivery Timeline: 45 days after receipt of advance payment. Equipment becomes operational within two weeks after arrival and debugging.

Note: Specification modifications during production require written notification and may affect delivery schedule and cost.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen HYPET Co., Ltd.
Location ROOM 2205 ANGEL BUILDING 4 ROAD BAGUA, SHENZHEN, CHINA
Contact Person Xiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.