Tunnel Powder Coating Oven System with Overhead Conveyor - 180-250°C Curing Temperature, 15-20 Minute Cycle
This tunnel powder coating oven with overhead conveyor system includes comprehensive spraying pretreatment for industrial applications, specifically designed for electric cabinets and metal workpieces.
Ideal for low-volume production, large/heavy workpieces, featuring dipping chemical tanks or sand/shot blasting pretreatment with manual powder coating booths.
Designed for high-volume production with fully integrated pretreatment, booth, and oven systems requiring minimal operator intervention.
Customizable pretreatment solutions based on workpiece condition and requirements:
- Spray/Dip Pretreatment: Phosphating, water rinsing, degreasing processes
- Sand Blasting: For heavily rusted workpieces
- Shot Blasting: Alternative surface preparation method
Integrated water drying oven and powder coating curing oven system:
- Curing time: 15-20 minutes
- Construction: 150mm rock wool steel board insulation
- Heating options: Diesel, natural gas, electric, or LPG
- Temperature range: 180°C to 250°C
- Burner: Riello brand for reliable performance
Available in multiple configurations:
- Stainless steel with filter recycle system
- PP Panel with cyclone recycle system for quick color changes
- Manual or automatic operation based on production requirements
| Parameter | Specification |
|---|---|
| Curing Temperature | 180°C - 250°C |
| Curing Time | 15-20 minutes |
| Oven Insulation | 150mm Rock Wool Steel Board |
| Heating Options | Diesel, Natural Gas, Electric, LPG |
| Burner Brand | Riello |
| Pretreatment Methods | Spray, Dip, Sand Blasting, Shot Blasting |
- Comprehensive installation documents and 3D assembly drawings
- Online engineering guidance for installation and debugging
- On-site installation services (chargeable)
- Complete operator training and ongoing usage tracking
- 1-year parts warranty covering fans, burners, electrical components, metal structures, and wall panels
- Continuous technical support throughout equipment lifespan
- Exclusions: Man-made damage cases
To receive a tailored solution, please provide:
- Workpiece material, maximum size, and weight
- Expected production output (8 hours/day or 30 days/month)
- Available workshop space dimensions (L×W×H)
- Preferred heating fuel: Electric, Gas, LPG, Diesel
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.