| Sign In | Join Free | My bjjsgy.com |
|
| Categories | Graphic Overlay |
|---|---|
| Brand Name: | Taida |
| Model Number: | 20251029-03 |
| Certification: | ISO9001,SGS,ROHS,REACH,UL |
| Place of Origin: | DongGuan of China |
| MOQ: | 300 pcs |
| Price: | communication |
| Payment Terms: | Western Union, T/T,PAYPAL |
| Supply Ability: | 78000 +pcs +a Month |
| Delivery Time: | 4-5 days for Samples making ;10-15 days for Batch goods |
| Packaging Details: | PE bags first and Foam in Carton and etc |
| Color: | Pantone, RAL CMYK ,RGB or samples |
| Adhesive: | 3M467 T4000 adheisve or other reuqest |
| Custom Sizes: | Available |
| Colors: | Customized |
| Certifications: | RoHS, UL, CSA |
| Printing: | Screen printing |
Industrial Control Panel Graphic Overlay With Tactile Feedback And
Custom Embossed Buttons For Easy Operation
An industrial control panel with a graphic overlay, tactile feedback, and custom embossed buttons offers several benefits for easy operation [1][2].
Here's a breakdown of the components and their advantages:
Stickers spec :
Thickness
Size & Shape
Absolutely, here are some of the key industries and applications
that commonly utilize embossed button control panel overlays:
Other photo show :

FAQ:
Q1. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but
the customers have to pay the sample cost and the courier cost.
Q2. What is your terms of payment?
A:T/T 50% as deposit, and 50% before delivery. We'll show you the
photos of the products and packages before you pay the balance.
Q3.Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.
Q4.What information will I have to provide for price?
A:To offer the exact price, we hope customers could inform us the
material, specification as thickness, size, with adhesive or not,
how many colors for printings, contact details, quantity required,
Size and Shape with artwork files.
Q5.How about your delivery time?
A: After the engineering drawing is confirmed, the sample will be
completed in 5 days, and after the sample is confirmed, the mass
goods will be completed in 10 days.The specific delivery time
depends on the items and the quantity of your order.
|