Guangdong Bunge Building Material Industrial Co., Ltd
                                                                                                           
Verified Supplier
19 Years
Since 2007
Menu

Customized Movable Partition Walls On Aluminum Track For Exhibition Halls

Price Negotiable
Price: USD 80-90 Square meters
MOQ: No MOQ
Delivery Time: 15 workdays
Brand: BUNGE
Product Description

OEM ODM Customized Style Popular Movable Partition Walls On Aluminum Track For Banquet Hall

 

Modernized Soundproof Movable partition
1.Hanging on ceiling The floor without a track, just put the rail mounted on the ceiling
2.Excellent Quality Each pieces of partition can turn around 360 degree.
3.Stable and secure After partition is stable and reliable, and is not easy to swing
4.Energy efficient The large space divided into a small space, in order to reduce air conditioning power consumption;
5.Heatproof&fireproof Good heat insulation performance, Adopt effective fire prevention materials
6.Elegant appearance Surface any adornment, can unite with indoor adornment effect
7.Easy to collect Can be hidden in the special coffer, does not affect the overall appearance
8.Various applications Hotels, exhibition halls, restaurants, multi-functional rooms etc.

 

 

Partition detail analysis

 

1: Anti-skid groove is added in the single-wheel track, so that the lifting wheel can still slide smoothly under the condition of side deviation

 

2: Double wheel bearing 300KG

 

3: Rail multi-angle bevel cutting surface, no cracking using German imports inch industrial grade aluminum cutting machine cutting.45 90 180

 

bevel section, seamless joint using low-frequency modulation pulse MIG welding technology, no cracking.

 

4: Imported bearing, high speed, stable and smooth

 

 

FAQ

 

1:What you should you do on site?

A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.

 

2:How to install?

We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.

 

3:What is lead time ?

The lead time is 7 days to 10days.

 

4:How to transport?

Sea transport is a common mode of transportation.In an emergency,can be air freight .

 

5:How do the goods packing?

Carton paper package ,MDF batten cover all around cotner.

 

6:What is procurement procedure?

Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)

Secondly, we offer you the movable wall layout drawings for your confirmation.

Thirdly, we quote the movable wall in acordance with confirmed drawings.

 

 

Our services

 

Professional drawing design

 

Professional production and installation team

 

High quality materials and accessories

 

It offers a three-five year warranty

 

 

Cooperation steps

 

Step 1: send us an inquiry.

 

Step 2: send us detailed engineering drawings or dimensions.

 

Step 3: we offer solutions and quotes.

 

Step 4: negotiate and discuss details.

 

Step 5: place the order and arrange the deposit.

 

Step 6: make detailed construction drawings and review before production.

 

Step 7: determine the construction drawing and arrange production.

 

Step 8: quality control and inspection.(production pictures are provided for verification)

 

Step 9: arrange shipment after receiving the balance.

 

Step 10: provide installation drawings

 

Step 11: after sales service

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Bunge Building Material Industrial Co., Ltd
Location No.1 Weigu 2nd Street, Liwan District, Guangzhou, China
Contact Person Buffy Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.