Guangdong Bunge Building Material Industrial Co., Ltd
                                                                                                           
Verified Supplier
19 Years
Since 2007
Menu

Tempered Sliding Glass Movable Partition Wall Office Project Sliding Wall

Price Negotiable
Price: $89-119 per square meter.
MOQ: No MOQ, small quantity welcome
Delivery Time: 7-15 days
Brand: EBUNGE
Product Description

Tempered Sliding Glass Movable Partition Wall Office Project Sliding Wall

 

 

1.Bunge Glass Partition Systems-Technical Information

 

Series BG65 Glazing Glass Partition BG85 Aluminum Frame Glass Partition BG85 Sound proof Glass Partition
Panel suspension Top hung only Top hung only Top hung only
Track system Single or twin point Single or twin point Single or twin point
Panel thickness 36mm 85mm 85mm
Panel height Up to 3000mm Up to 6000mm Up to 6000mm
Max height 3000mm 6000mm 6000mm
Panel width 800-1100mm 800-1100mm 800-1100mm
Frame construction Top and bottom aluminum Aluminum frame Aluminum frame
Glass thickness 10mm single glass 10mm or 12mm single glass double 10mm glass
Fire safety Optional Class O Optional Class O Optional Class O
Vertical profiles n/a n/a Aluminum anodized with sealing profiles
Retractable seals n/a n/a Aluminum black with double rubber seals
Operation of seals n/a n/a  
Pass doors Fixed full height door Fixed full height door Fixed full height door
Locking Optional lock to panel Optional lock to panel Optional lock to panel
Sound insulation n/a n/a n/a
Weight Approx 30 kg/sq M Approx 32 kg/sq M Approx 50 kg/sq M

 

 

2. Tempered glass is a heat toughened safety glass. It has undergone a special heat treatment to increase its strength and resistance to impact. In fact, tempered glass is approximately five times more resistant than normal glass. As an example, a piece of 8mm tempered glass will be able to withstand a steel ball weighing 500g dropped from a height of 2 meters.

 

 

3.FAQ

 

(1).What you should do on-site?


A beam(truss) should be built on-site for track installation. The min distance leaving for track installation from a false ceiling to top ceiling is 200mm.


(2.)How to install?


We will provide the installation manual and video guiding the installation job. We can also dispatch the installation engineer supervising the installation as request.


(3).What is the lead time?


The lead time is 7 days to 10 days.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Bunge Building Material Industrial Co., Ltd
Location No.1 Weigu 2nd Street, Liwan District, Guangzhou, China
Contact Person Buffy Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.