GCr15 Door Frame Roll Forming Machine 11KW Power 8000mm Length for 2mm Galvanized Steel
Price:
negotiable
MOQ:
1 set
Delivery Time:
60 days after deposit
Brand:
SUSSMAN
Product Description
Product Overview
Professional GCr15 door frame roll forming machine designed for high-efficiency production of door frames using galvanized steel. Features high-frequency quenching rollers for extended durability and precision performance.
Technical Specifications
- Material Compatibility: 1.5-2.0mm galvanized steel (customizable)
- Operating Speed: 3-15 meters per minute
- Forming Steps: Approximately 18 stages
- Roller Material: GCr15 steel with precision machining and high-frequency quenching (HRC58-62)
- Main Shaft Material: 45# high-quality steel
- Chain System: 45# steel with high-frequency quenching, circular pitch 38.1, 13 teeth
- Main Motor Power: 11KW
- Control System: PLC electronic control
- Machine Dimensions: Approximately 8000mm × 800mm × 800mm
- Total Weight: Approximately 5 tons
- Drive System: Chain drive
- Total Power Consumption: 10.5KW
Detailed Performance Parameters
| Item | Parameter | Remark |
|---|---|---|
| Suitable Material Type | Galvanized Steel | |
| Material Thickness | 2.5-3.0mm | Customizable per requirements |
| Yield Strength | 230-300 Mpa | |
| Forming Speed | 20 m/min | Excluding punching and cutting operations |
| Punching Die Material | Bearing Steel | With quench treatment |
| Cutting Mode | Hydraulic Cutting | Customizable per requirements |
| Power Source | 380V/3PH/50HZ | Customizable per requirements |
Production Workflow
De-coiler → Level Device → Main Forming Machine → Straightening → Hydraulic Punching → Hydraulic Cutting → Run Out Table
Machine Components
| Component | Quantity (set) |
|---|---|
| Decoiler | 1 |
| Level Device | 1 |
| Main Forming Machine | 1 |
| Hydraulic Punching | 1 |
| Hydraulic Cutting Machine | 1 |
| Cutting Blades | 5 |
| Straightening | 1 |
| PLC Control Panel | 1 |
| Run Out Table | 2 |
Machine Visualization
Frequently Asked Questions
What is your delivery time?
Within 45-60 days after receiving prepayment. Some machines are available in stock for immediate delivery.
What are your payment terms?
30% deposit required before production begins, with the balance paid after inspection confirmation prior to shipment.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Sussman Machinery(Wuxi) Co.,Ltd
Location
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Contact Person
Spring Wu