High School Water - Based Jogging Track Material With Durable Silicon PU Top Finish
High School Water - Based Jogging Track Material With Durable Silicon PU Top Finish
Jogging Track Material Description
Free of heavy metal,no harmful substance
All weather use;indoor&outdoor use
Nice performance for aging;electriacl insulation,corrision and impact-resistant
Convenient to install and easy to maintain
Long service time:over 10 years
Jogging Track Material Specifications
|
Product |
Jogging Track Material |
||
|
Thickness |
13 mm or customized |
||
|
Force Reduction |
41 |
||
|
Tensile Strength |
1.56 |
||
|
Elongation at break |
92 |
||
|
Modified Vert. Deform. |
1.9 mm @ 23°C [75°F] |
||
|
Friction |
0.64/48 |
||
|
Material |
EPDM, SBR, Reclaimed Rubber, ETC. |
||
|
Features |
Environmental-friendly, UV-resistance, 5--10 years service time |
||
|
Market |
North America, Southeast Asia, Western Europe, Domestic Market |
||
|
Application |
Outdoor Rubber Track, Playground Sports Flooring,etc. |
||
|
More Test Data |
|||
|
Test Item |
Reference |
Standard Data |
Test Result |
|
Tensile |
IAAF |
≥0.5 |
1.56 |
|
Elongation at Break |
IAAF |
≥40 |
92 |
|
Force Reduction |
IAAF |
35-50 |
41 |
|
Vertical Deformation |
IAAF |
0.6-2.5 |
2.3 |
|
Skid Resistance |
IAAF |
≥47 |
57 |
|
Hardness Shore A |
GB/T 14833-2011 |
45-60° |
45-55° |
|
Fire Rating |
GB/T 14833-2011 |
I Degree |
I Degree |
|
Color Stability |
|
|
Good |
|
Chemical Resistance |
|
|
Good |
Jogging Track Material Applications
Applicable to all types of schools at all levels and professional stadium, athletics track, semicircle area,
auxiliary area, fitness paths, indoor stadium training track, playground surfacing roads, indoor and
outdoor track.
FAQ
Q:What is the Production time?
A:15-25days.
Q:What are the options for the base construction of a running track?
A:Based on asphalt or concrete.
Q:What is the life Span for Running track?
A:10-15years.
Q:How many system of Synthetic track surface,what is the best choice?
A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.
Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricate :Eco-friendly,package by roll, easy for installation,Professional for stadium international games,like Olympic games.
Running Track
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
