Zhengzhou Sinolion Equipment Co., Ltd
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

High capacity rotary trommel screen equipment for compost processing

Price Negotiable
Price: USD4000-28000/SET
MOQ: 1set
Delivery Time: 5-8 working days
Brand: Sinolion
Product Description

High capacity rotary trommel screen equipment for compost processing

 

Introduction of compost processing trommel 

 

MTS series trommel screen machine is well known for its large processing capacity of compound fertilizer and farm compost. It is also a good choice for the classification of refractory materials, coal, sand , soil, grval, earth, sandstone block, limestone, metallic or non-metallic minerals,etc.

 


The structure of 
compost processing trommel

 

The main structure of trommel screen machine is sieving cylinder, which is composed of several circular shape of the screen.The whole and ground plane is in heeling condition.External sealed the isolation cover seal is to prevent the pollution of the environment. The speed reducing system enables the screening cylinder rotates at a certain speed.Thus the material is separated by sieving cylinder from top to bottom.Afterwards fine material is discharged from the lower front part of sieving cylinder.While coarse material discharged from the tail end of the screening cylinder.

Operation

 

(1) Smoothly operation and low noise.
(2) High powerful Screening ability, screened and washed widely and remarkable effects.
(3) The screening tube can be closed, easy to collect dust airtight.
(4)The high reliability and one-time investment is less.

 

 

Main technical parameters:

Model capacity(t/h) power(kw) screen diameter(mm) screen length(mm) volume(m³) sieve square meters shell dimension(m)
MTS0818  <15 2.2 800 1800 0.4 3 1.2*0.8*0.8m
MTS1022  <30 2.2 1000 2200 1.1 5.3 2*1.3*0.7m
MTS1230  <60 4 1200 3000 2 8.3 2.35*1.6*0.88m
MTS1550  <90 5.5 1500 5000 4.5 18.84 3*1.7*1m

 

 

Frequent questions

 

Q1: How long is the delivery time?

A: It will takes about 7-10 days for delivery after pre-payment.

 

Q2: What is the driving force?

A: Japan Honda Gasoline Engine. The Honda Gasoline Engine could supply Environmental Protection Certificate.

 

Q3: How long is the warranty period A: One year

 

Q4: Do you have a certificate of origin, EU certification, etc. A: yes, of course

 

Q5: How many wheels does it have?

A: There are two and four rounds, according to customer requirements

 

Shipping & packing

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhengzhou Sinolion Equipment Co., Ltd
Location 11 Building, 863 Software Park, Zhengzhou city, Henan province, China
Contact Person Sonia

Request A Quote

Please check your email address.
Your message must be at least 20 characters.