380V ZHF-2017 Polyurethane Foam Machine with 300kg/min Output and 18m Oven for Sofa & Shoe Production
Price:
inquiry
MOQ:
one set
Delivery Time:
45days after receive downpayment
Brand:
ZHMACH
Product Description
Automatic Polyurethane Foam Production Line
The ZHF-2017 Horizontal Continuous Foaming Machine is a fully automated production line designed for manufacturing flexible polyurethane foam used in furniture, footwear, packaging, electronics, garments, and transportation industries. This industrial-grade equipment is ideal for large-scale foam production operations.
Technical Specifications
Production Capacity
| Parameter | Specification |
|---|---|
| Oven Length | 18m |
| Foam Height Range | 1.0-1.25m |
| Foam Width Range | 1.0-2.25m |
| Foam Density Range | 8-200kg/m³ |
| Total Power Consumption | 130KW |
| Conveyor Belt Speed | 0-8m/min |
| Maximum Output | 300kg/min |
| Machine Dimensions | 35m × 4.2m × 3.2m |
Advanced Control System
- 13 material groups with human-machine interface
- PLC control system with manual and automatic operation modes
- Capable of continuous foaming with two different formulas simultaneously
- All inverter-controlled foaming synchronized with production line
- Adjustable oven declining board height and width via control box
Premium Components
- Siemens inverters and motors for reliable performance
- U.S. Viking pumps for consistent material delivery
- High-quality spare parts ensuring long-term durability
Transducer Configuration
| Model | Power (kW) | Application | Quantity | Brand |
|---|---|---|---|---|
| G120 | 37 | Mixing Head | 1 | Siemens |
| G120 | 7.5 | POP, CaCo3 | 2 | Siemens |
| G120 | 5.5 | PPG | 1 | Siemens |
| G120 | 4 | TDI, Flame Retardant | 2 | Siemens |
| G120 | 2.2 | MC, Color | 2 | Siemens |
| G120 | 1.5 | Water, Ann, Si, Tin, Anti-yellow | 7 | Siemens |
| G120 | 0.75 | Spray Head | 1 | Siemens |
| VFD-B | 5.5/3.7/1.5 | Conveyor Systems | 3 | Delta |
Installation & Support
Installation Timeline
Complete installation requires approximately 45 days, including 30 days for mechanical setup and 15 days for electrical connection and commissioning.
Technical Support
Our engineers provide on-site installation support and comprehensive after-sales service with 24-hour response time for technical issues.
Product Documentation
Machine Overview
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Zehui machinery equipment co., ltd
Location
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person
Wang