ZHF-2019 Horizontal Polyurethane Foaming Machine Line for Pillow & Mattress Production - 35m Length, 300kg/min Output

Price Negotiable
Price: inquiry
MOQ: one set
Delivery Time: 45days after receive downpayment
Brand: ZHMACH
Product Description
Product Overview

The ZHF-2019 Horizontal Continuous Polyurethane Foaming Machine Line is an automated production system designed for manufacturing flexible polyurethane foam used in furniture, footwear materials, packaging, electronics, garments, and transportation industries. This industrial-grade equipment is ideal for large-scale foam production operations.

Technical Specifications
Machine Dimensions & Components
  • Foaming Controlling Platform: 3m × 2.52m × 0.7m
  • Oven Declining Board: 6.8m × 0.98m-2.3m
  • Oven Side Links: 18m × 2.3m × 1.2m
  • Oven Machine Frame: 18m × 4m × 3m
  • Oven Inner Conveyer Line: 18m × 2.3m × 0.83m
  • Foam Block Cutter Machine: 2.3m × 1.30m (knife belt with cross type)
  • Side Film Lift System: Complete set included
Performance Parameters
ParameterSpecification
Overall Dimensions35m length × 4m width × 3m height
Foaming Material Groups13 groups with man-machine interface
Foaming Width Range980mm to 2250mm
Maximum Foaming Height1200mm
Foaming Density Range8kg/m³ to 100kg/m³
Foaming Speed Range2000r/min to 7000r/min
Maximum Total Output300kg/min
Mixing Head Motor Power37kW
Total Power ConsumptionApproximately 90kW
Control System Features
  • PLC control system with dual-formula continuous foaming capability
  • All-inverter controlled foaming synchronized with production line
  • Adjustable oven declining board height and width via control box
  • Adjustable oven side links width via control box
  • Material spraying options: down sprayer head (adjustable directions) or trough overflow pipe
Premium Components

This foaming machine line incorporates high-quality components including Siemens inverters and motors, U.S. Viking pumps, and other premium spare parts to ensure reliable flexible foam production. The system can produce foam densities from D8 to D100 and accommodate up to 50% lime powder addition for densities above D23.

Frequently Asked Questions
Q: How many days are required for machine installation and testing?
A: Installation requires approximately 30 days with 1-2 engineers, followed by 15 days for electrical connection and machine testing. Total timeline: 45 days.
Q: What are the engineer service costs?
A: Engineer service rate is USD 40 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
Q: What raw materials and tools are needed for testing?
A: We provide a comprehensive list of required tools and raw materials, and can assist with procurement if requested.
Q: Can you provide ongoing technical support?
A: Yes, we can help hire experienced engineers for ongoing factory operations and provide 24-hour technical support for any production issues.
Machine Components
ZHF-2019 Horizontal Polyurethane Foaming Machine Line overview Detailed view of foaming machine components and control system
Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.