PLC Control EPE Foam Sheet Extrusion Line - 230kg/h Output, 35m Length, 90kW Power for PU Foam Manufacturing
Price:
inquiry
MOQ:
one set
Delivery Time:
45days after receive downpayment
Brand:
ZHMACH
Product Description
Automated EPE Foam Sheet Extrusion Line with PLC Control
This fully automated batch box polyethylene foam production line delivers continuous foaming capabilities with output up to 230kg/h. Engineered for large-scale manufacturing, it produces foam densities ranging from 6 to 100 kg/m³ with exceptional quality and cost efficiency.
Technical Specifications
| Parameter | Specification |
|---|---|
| Overall Dimensions | 35m length × 4m width × 3m height |
| Foaming Material Groups | 13 groups with man-machine interface |
| Foaming Width Range | 980mm to 2250mm |
| Maximum Foaming Height | 1200mm |
| Foaming Density Range | 8kg/m³ to 100kg/m³ |
| Foaming Speed Range | 2000r/min to 7000r/min |
| Maximum Total Output | 300kg/min |
| Mixing Head Motor Power | 37kW |
| Total Power Consumption | Approximately 90kW |
Advanced Control System
The system features PLC control with touch screen operation, enabling:
- Formula changes without stopping production
- Continuous foaming of two different formulas simultaneously
- All-inverter controlled foaming synchronized with production line
- Adjustable oven declining board height and width via control box
- Adjustable oven side links width via control box
Material Spraying Options
- Down sprayer head method (adjustable upper, down, front, back)
- Trough overflow pipe method
Shipping & Packaging
The machine is shipped nude packed with critical components in wooden cases. Standard 13-group configuration requires 2×40HQ + 1×20GP containers for optimal freight efficiency.
Comprehensive Support Services
- Factory layout design consultation
- On-site installation by 2-4 experienced engineers
- Comprehensive operator training and maintenance guidance
- Complete operation manual and optimized product formulations
- Raw material sourcing assistance
Frequently Asked Questions
Installation and testing timeline?
Approximately 45 days total: 30 days for mechanical installation with 1-2 engineers, plus 15 days for electrical connection and machine commissioning.
Engineer service costs?
USD 40 per day per engineer, plus visa fees, round-trip tickets, and accommodation.
Technical support availability?
24-hour response guarantee for technical issues via phone, pictures, or video consultation.
Machine Components
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Zehui machinery equipment co., ltd
Location
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person
Wang