Dongguan Zehui machinery equipment co., ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Full Automatic Low Pressure Polyurethane Foam Machine 300kg/min with 18m Oven and PLC Control

Price Negotiable
Price: inquiry
MOQ: one set
Delivery Time: shipped in 45 days after payment
Brand: ZHMACH
Product Description
Full Automatic Low Pressure Polyurethane Foam Machine
This industrial-grade horizontal continuous foam production line is designed for manufacturing polyurethane foam blocks used in mattresses, sofas, and upholstery applications. The system features PLC control with inverter automation and touch screen interface for precise operation.
Key Specifications
ParameterSpecification
Total Dimensions35m Length × 4m Width × 3m Height
Foaming Width Range980mm - 2350mm
Foaming Height RangeUp to 1300mm
Foaming Density Range8kg/m³ - 100kg/m³
Maximum Output Capacity300kg/min
Foaming Speed Range2000r/min - 7000r/min
Total Power ConsumptionApproximately 90kW
Mixing Head Motor Power37kW
Oven Length18m
Advanced Control System
  • PLC-based control system with touch screen interface
  • Stores over 200 different foam formulas for quick selection
  • All inverter-controlled foaming synchronized with production line
  • Adjustable oven declining board height and width via control box
  • Oven side links width adjustable through control interface
Material Components
13-group foaming material system with both manual and computerized control options. Two material spraying methods available: down sprayer head (adjustable in upper, down, front, back directions) and trough overflow pipe system.
Transducer Configuration
ModelPowerApplicationQuantityBrand
G12037kWMixing Head1Siemens
G1207.5kWPOP, CaCo32Siemens
G1205.5kWPPG1Siemens
G1204kWTDI, Flame Retardant2Siemens
G1202.2kWMC, Color2Siemens
G1201.5kWWater, Ann, Si, Tin, Color Anti-yellow7Siemens
G1200.75kWSpray Head1Siemens
VFD-B5.5/3.7/1.5kWOven Conveyer Systems3Delta
Technical Support & Warranty
  • 12-month limited warranty from delivery date (excluding wear parts)
  • 2 technicians provided for installation, commissioning, and training
  • 45-day total installation and testing period
  • Technical support available for ongoing operational needs
Frequently Asked Questions
How many days for machine installation and testing?
Total 45 days: 30 days for mechanical installation with 1-2 engineers, plus 15 days for electrical connection and machine testing.
What are the engineer costs during installation?
USD50 per day per engineer, plus visa fees, round-trip airfare, and accommodation expenses.
Product Images
Full automatic polyurethane foam machine production line overview Close-up view of foam machine control panel and mixing components
Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.