ZHMACH Continuous Foam Production Line 35m Length 300kg/min Output For Mattress Manufacturing
Price:
inquiry
MOQ:
one set
Delivery Time:
45days after receive downpayment
Brand:
ZHMACH
Product Description
Continuous Foam Production Line Overview
The ZHMACH Horizontal Continuous Foam Machine is a professional-grade production line designed for manufacturing flexible foam used in mattresses, sofas, and other applications. This low-pressure foaming system utilizes premium components including Siemens inverters/motors and U.S. Viking pumps to ensure reliable performance and consistent foam quality.
Technical Specifications
Production Capabilities
| Foaming Density Range | 8-100 kg/m³ |
| Maximum Output Capacity | 300 kg/min |
| Foaming Width Range | 980-2250 mm |
| Maximum Foaming Height | 1200 mm |
| Conveyer Belt Speed | 0-8 m/min |
| Total Power Consumption | 90-130 KW |
Equipment Dimensions
| Total Machine Length | 35 m |
| Total Machine Width | 4 m |
| Total Machine Height | 3 m |
| Oven Length | 18 m |
Key Features
- 13 material groups with man-machine interface for precise control
- PLC control system enabling continuous foaming of two different formulas simultaneously
- Full inverter control for synchronized foaming and production line operation
- Adjustable oven declining board height and width via control box
- Two material spraying methods: down sprayer head and trough overflow pipe
- 37KW mixing-head motor for efficient material processing
Pneumatic & Flow Control Equipment
| Model | Application | Quantity | Brand |
|---|---|---|---|
| K-301L/75DA cross valve | POP, PPG, CaCO3, Foam | 3 | Korea |
| K-301L/63DA p cross valve | TDI foam | 1 | Korea |
| K-301L/32DA cross valve | Small materials, Flame retardant, Anti-yellow | 9 | Korea |
| DK800 glass flow meter | AIR | 1 | China |
Packaging & Shipping
The machine is primarily nude packed with select parts in wooden cases. Standard configuration requires 2×40HQ containers and 1×20GP container for complete shipment.
Frequently Asked Questions
Installation and Testing Timeline
Complete installation requires approximately 45 days, including 30 days for mechanical installation and 15 days for electrical connection and machine commissioning.
Technical Support Services
We provide comprehensive after-sales support with 24-hour response time for technical issues. Engineering support is available at $40 per day per engineer plus associated travel expenses.
Raw Material Preparation
We supply a detailed list of required tools and raw materials for testing, with optional procurement assistance available.
Product Images
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Zehui machinery equipment co., ltd
Location
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person
Wang