GREEN LIGHTING TECHNOLOGY CO.,LTD
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Professional Ultra Bright Cree Led Rechargeable Headlamp OEM anti - explosion

Price Negotiable
Price: can negotiate
MOQ: 200pcs
Delivery Time: 5-7 days after payment
Brand: Green lighting
Product Description

 

 

Professional Ultra Bright Cree Led Rechargeable Headlamp OEM anti - explosion

 

 

New GL2.5-C Advantage                                                                                                               

 

Charging interface waterproof effect improved;
Affordable, marketable low-end consumer countries;
Simple structure, easy disassembly, assembly, maintenance!

 
 
 
Technical Specifications                                                                                                               
 
Light source 1pc main light / 6pcs auxiliary light
Battery capacity 3.8Ah
Nominal votage 3.7V
Battery 1*18650 lithium
Main light current 230mA
Main light power 0.85W
Llluminous 110lum
Lamp lighting degree 7000lux
Life span of main light 10.0000 hours
Battery cycles 1200 cycles
Charging time 6h
Working time 13h
Weight 158g
Water proof grade IP67

 

 
 
 
Packaging & Delivery                                                                                                              
 

Packaging: One set each gift box with 1pc head lamp, 1pc USB charger / Single Charger and Manual; Also accept customized packing.

 

Delivery: 5-7 days after made payment.

 

 

 

Payment Accepted                                                                                                                          

L/C, D/A, D/P, T/T, Western Union, MoneyGram, Alipay, Escrow etc.

 

 

 


Safety Warning                                                                                                                                

 

a) Please do not shoot at eyes directly while the lamp is working since the strong light will hurt eyes.
b) Please do not disassemble the cap lamp, otherwise it maybe cause potential troubles related to safety, reliability to work underground.
c) Please do not charge the lamp underground.
d) Please keep the lamp away from fire sources.
e) Please do not disassemble the lamp or repair the battery parts by yourself.
f) Please do not crash and stike the lamp.
g)Please do not replace the structure of the lamp and parts.

 

 


Troubles & Troubleshooting                                                                                                        

 

Trouble description Trouble analysis Troubleshooting

Light dose not work when the button was pressed

Battery is running out or automatic opening protection

Charge the lamp

Lighting time isn't up to 12 hours

Battery charging time is too short

Make sure the lamp well connected to the charger when charging

Charging time too long

The charging points poor contact

Clean the charging points and the slot

Brightness isn't enough

The lens isn't clear

Wash lens clear

 

 

 

FAQ                                                                                                                                                         

 

Q: What is the advantage of environmental protection?

A: The LED solid state light source,no lead and mercury,no radiation pollution ,after the of recyclable.

 

Q: What is emergency device?

A: Optional configuration,integration design ,safety,long life ,can be removed from the DC power supply system

 

Q: What is the lead time?
A: Sample needs 7-10days, mass production time needs 25-30days.


Q: Do you have any MOQ limit?
A: Our MOQ EXW is 1 pc for sample; MOQ FOB is 200pcs.(Depends on different type battery/battery pack)


Q: How do you ship the goods and how long does it take arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive.


Q: How to proceed the order when customer order products?
A: Inquiry-Confirmation-Send Proforma Invoice-Customer make payment-Arrange production-ship the
goods to customers-Confirmation-Finish.


Q: How to make this payment?
A: TT, Paypal, Western Union.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company GREEN LIGHTING TECHNOLOGY CO.,LTD
Location 2nd Floor, 1st Building , Concept Space Industrial Park, Baolong Street, Longgang District , Shen Zhen City, China. 518116
Contact Person Jessica

Request A Quote

Please check your email address.
Your message must be at least 20 characters.