Rotary Water Small 200m Crawler Mounted Drill Rig Portable Machine
Crawler Mounted Rotary Water Small Drilling Rigs Portable Machine For Sale
ST 200 Pneumatic Drilling Rig Introduction
ST 200 Pneumatic Drilling Rig Series Well Drilling Rig is a light, efficient and versatile drilling equipment powered by diesel engine which is from China famous brand. It is mainly suitable for drilling wells, agricultural irrigation wells and other uses, especially for water extraction in mountainous and rock formations engineering.
ST 200 Pneumatic Drilling Rig Technical Parameter
| Model | ST 200 |
| Condition | New |
| Type | Water Well Drilling Rig |
| Power Type | Diesel |
| Place of Origin | China |
| Brand Name | Shitan |
| Usage | Ore |
| Dimension(L*W*H) | 6400MM*2250MM*2700MM |
| Weight | 5800KG |
|
Certification
|
ISO9000 |
| Warranty | 1 YEARS |
| Marketing Type | New Product 2020 |
| Drilling diameter | 90-152mm |
| Depth | 25M |
| Rotary speed | 0-90rpm |
| DTH | K40 |
| Drilling Rods | 76*2m+76*3m |
| Air consumption | 13-20m3/min |
| Travelling | 0-2.5km/h |
projects in rock formations in mountainous areas.
It is equipped with high-torque hydraulic motor and large-bore hydraulic cylinder for propulsion, and the pump set design is
convenient for maintenance.
independent modular design, and superior maneuverability.
3. The combined positioner can be adjusted and replaced according to different types of drill rods and impactors to ensure
accurate positioning and centering.
bearing capacity and the support height of the outriggers can reach 1.5 meters. The loading and unloading truck can reduce the
cost of hoisting and can be used as a leveling and stable drilling rig during work. 5. The hoisting mechanism facilitates the
lifting of drilling tools, reduces the labor intensity of the operator, and saves time and effort
Measures taken during the running in period of water well drilling rig.
1. Pay attention to the working load during the running in period. Generally, the working load during the running in period should not exceed 80% of the rated working load, and appropriate workload should be arranged to prevent overheating caused by long-term continuous operation of the machine.
2. Observe the indication of each instrument frequently. If there is any abnormality, stop the machine in time to eliminate it
3. Pay attention to strengthen the lubrication of each lubricating point. It is recommended that during the running in period, each shift should add lubricating grease to the lubricating point (except for special requirements).
4. Keep the machine clean and adjust and fasten the loose parts in time.
5. At the end of the running in period, the machine shall be compulsorily maintained, inspected and adjusted, and the oil shall be replaced.
In a word, the requirements for the use and maintenance of water well drilling rigs during the running in period can be summarized as: reduce the load, pay attention to inspection, and strengthen lubrication. As long as attention is paid to and maintenance of construction machinery during the running in period is carried out as required, the occurrence of early failures will be reduced, the service life will be extended, the operation efficiency will be improved, and more economic benefits will be brought to you.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.