Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Efficient Core Drilling Deep Well Drilling Machine For Geotechnical Information Collection

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-10 days
Brand: JINZHOU SHITAN
Product Description

Efficient Core Drilling Rig Machine for Geotechnical Information Collection in Construction Industry

 

Description of Core Drilling

 

Core Drilling is the least invasive type of drilling and is used in difficult or remote areas. A very high standard of quality or representative of the geology can be collected and the information used as the basis for consideration, design and construction based on the potential of the ore body or nature of the geology.

 

The information is used in modelling to give engineers and geologists a visual representation of what is underground that cannot be seen from the surface. It is a relatively lower cost method due to the drilling method.

 

Applications

 

Core Drilling is used in underground mining for delineation of an ore body and resource definition and valuation. It is used in tunnel infrastructure to ensure that no methane pockets of air are mined into, as well as for water bearing areas that could potentially flood the underground infrastructure. In addition, Core Drilling is used for the geo-technical evaluation of the nature, material properties and type of rock for the purposes of designing a certain size shaft, tunnel or stoping panel to be used for the calculation of the type and amount of rock support required.
In the construction or urban infrastructure industries, Core Drilling is mainly used for geo-technical information in the design of foundations for bridges, buildings, tunnels, etc.

 

Main Parameter

 

(1) Rated drilling depth:200m,The deepest shall not exceed 220m.

Rated opening diameter:200mm.

Maximum opening diameter : 300mm.

Drilling depth and drilling diameter shall be determined according to the formation conditions.
(2) The vertical speed (four steps):118,236,505,1010.r/rain
(3) Max output torque:1500N. m
(4) Maximum weight (a speed of single rope):17KN
(5) drill pipe diameter:42mm
(6) Borehole inclination:90~75°
(7) Rig overall dimensions·(L×B×H)1433×697×1273mm
(8) Rig weight:500kg(Transfer machines 620kg, transfer machine with pump 720kg)
(9) Engine model:S1115

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.