260 Meters Deep Water Well Boring Machine With Large Horsepower
| Product Name | ST 260 Water Well Drilling Rig |
| Drilling Depth | 260 Meters |
| Drilling Diameter | 105-260mm |
| Power Type | Diesel |
| Rated Power | 55-132KW |
| Weight | 6T |
| Dimensions | 4m × 1.7m × 2.2m |
| Warranty | 24 months |
| After-sales Service | Video technical support |
The ST-260 Water Well Drilling Rig is a multifunctional hydraulic well drilling rig series primarily designed for industrial and civil drilling applications, including geotemperature drilling. This robust machine offers significant advantages including large drilling diameter capacity, deep drilling capability, rapid footage, and high operational efficiency.
| Drilling Depth | 260m |
| Hole Diameter | φ105-260mm |
| Advance Length per Cycle | 6.6m |
| Working Pressure | 1.7-3.0MPa |
| Air Consumption | 17-35m³/min |
| Rod Length Options | 1.5m, 2m, 3m, 6m |
| Rod Diameter Options | φ76, φ89, φ102, φ114 |
| Lifting Power | 24T |
| Rotation Torque | 8500-11000N.m |
| Rotation Speed | 40-70r/min |
| Diesel Engine | Yuchai |
| Engine Power | 85Kw/2200rpm |
| Travelling Speed | 0-2.5 Km/h |
| Climb Capacity | 30° |
| Weight | 9000kgs |
| Dimensions | 5900x2000x2850mm |
| Application | Complicated geological conditions: Rock, Mud, Sand etc. |
| Drilling Methods | Top drive hydraulic rotary and propulsion, DTH Drilling or Mud Pump Drilling |
| DTH Hammer Options | 4",5",6",8" Drill hammer or CIR110, 130, 150, 170 |
- Advanced hydraulic technology with high torque hydraulic motor rotation
- Large bore drill hydraulic propulsion system
- Branded multi-cylinder engine with two-stage air filter
- Specialized intake air compressor designed for hydraulic systems
- Unique pump design for easy maintenance and reduced costs
- Centralized hydraulic control console for simplified operation
Yes, we are a manufacturer specializing in construction machinery with a complete product series.
We typically accept T/T (Telegraphic Transfer) payments.
Delivery is typically within 7 days after receiving the deposit.
12 months after shipment (6 months for the engine).
The MOQ is 1 set.
Yes, we welcome OEM orders and can apply your branding to the products.
1. Depth Assessment: Verify underground utilities (cables, sewers) before drilling to prevent damage.
2. Water Quality: After drilling, place charcoal at the well bottom to absorb toxins. Test water safety with small fish.
3. Well Construction: Keep the well above ground level with proper brick/stone enclosure and cover to prevent contamination and ensure safety.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.