Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

350m Drilling Equipment For Water Well Full Hydraulic

Price Negotiable
Price: A detailed discussion
MOQ: 1 Set
Delivery Time: 5-8days
Brand: SHITAN
Product Description
350m Drilling Equipment For Water Well Full Hydraulic
Product Specifications
Attribute Value
Type Crawler Mounted Drill Rig
Drilling depth 350M
Application Drilling well, hammer for drills
Air pressure 1.25-3.5Mpa
After-sales service Engineers available to service machinery overseas
Warranty 1 Year
Weight 9800KG
Power 92Kw
Usage Water Well
Hole diameter 140-305mm
Condition New
Product Description
Mining Core Drilling Machine Full Hydraulic Crawler Surface Drilling Rig Underground Water Drill Machines
Introduction of ST350 Pneumatic Drilling Rig
Our water well drilling rig is a top-driven, high-efficiency multifunctional hydraulic drilling rig featuring advanced technology, convenient operation, high working efficiency, reliability and durability. It is widely used in drilling wells, inspection wells, precipitation wells, rescue wells, ground source air conditioning holes, CBM, natural gas, oil extraction and other projects. This machine can drill holes with air compressor in all formations, with very fast drilling speed in hard rock.
Technical Parameters
Parameter Value
Type ST350
Weight 9.8T
Dimension 6m×2m×2.5m
Hole diameter 105-305mm
Drilling depth 350m
One-time advance length 6m
Walking speed 2.5KM/H
Climbing angles 30°
Power 92KW
Using air pressure 1.7-3.3MPA
Air consumption 17-35
Drill pipe length 1.5m, 2.0m, 3.0m, 6.0m
Drill pipe diameter 89mm, 102mm
Rig lifting force 20T
Swing speed 55-115rpm
Swing torque 6200-85000N.m
Crawler Mounted Drill Rig Organization Composition
  • Hydraulic oil pump: Duplex type with large displacement pump providing power for the power head, and small displacement pump for outrigger cylinders, mast cylinders, and lift pulley cylinder.
  • Four legs: Composed of hydraulic oil cylinder and fixed frame to adjust machine levelness and provide stability.
  • Mast: Frame structure of steel pipe, channel steel and angle steel with inner grooves as tracks for power head movement, ensuring drilling verticality.
  • Power head: Gear reducer mechanism with large hole mandrel for concrete pouring equipment connection and drill pipe attachment.
Frequently Asked Questions
Are you a trading company or manufacturer?
We are a professional trading company with our own factory specializing in water well drilling rigs. Our products have been exported to over 20 countries including Azerbaijan, Kazakhstan, Asia, South America, Africa, India, and Egypt, earning excellent global reputation.
How about your machine quality?
All machines undergo rigorous testing to ensure the highest quality standards for our customers.
Do you have after-sale service?
Yes, we provide professional technical after-sales service with maintenance guidance and overseas engineer support.
What about the quality warranty?
We offer a one-year quality warranty on our products.
How long can you deliver the machine?
Standard delivery time is 7 days.
ST350 Water Well Drilling Rig in operation Close-up of drilling rig components Drilling rig mast and power head detail Technical diagram of ST350 drilling rig Crawler mounted drilling rig in field operation

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.