Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

8.9t Oem 350 Meters Crawler Mounted Drill Rig Pneumatic High Speed

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-10 days
Brand: JINZHOU SHITAN
Product Description

8.9 T High Drilling Speed 350 Meters Large Pneumatic Crawler Mounted Drill Rig



350 Meters Large Pneumatic Crawler Mounted Drill Rig Description


This drilling rig machine can serve the mining, stone crushing, water conservancy drilling industry, to help you solve the problem of drilling at high efficiency and low cost. We mainly provide mobile air compressors, drilling rigs, hammer, drill bit, crushers, underground water detector.


350 Meters Large Pneumatic Crawler Mounted Drill Rig Parameter


Product Name ST 350 Drilling Rig
Power Type Diesel
Place of Origin China
Brand Name SHITAN
Usage Ore
Dimension(L*W*H) 6400MM*2250MM*2700MM
Weight 8.9 T
Certification ISO9000
Warranty 1 YEAR
Marketing Type New Product 2020
Drilling diameter 152mm-305mm
Depth 25M
Rotary speed 0-90rpm
DTH K40
Drilling Rods 76*2m+76*3m
Air consumption 13-20m3/min
taavelling speed
0-2.5km/h


350 Meters Large Pneumatic Crawler Mounted Drill Rig  Advantages


1, drilling rig speed up to 14-1030r/min speed range, and the output of the maximum torque of 9500N.m.
2, drilling rig using long-stroke multi-speed mechanism, 
3, drilling rig using double-linked oil pump supply, drilling with a single pump, when the drill with dual pump combined flow;
4, the use of track chassis, leg cylinder travel 1.5m can be automatically loaded, relocation and transportation is convenient.



Main Attentions 350 Meters Large Pneumatic Crawler Mounted Drill Rig 


1. Operators must receive technical training, understand the structure principle and working performance of DTH, be familiar with the safe operation rules and maintenance rules of DTH, and pass the examination before they can operate alone.

2. the operation personnel should wear work clothes, wear a helmet, lesbians should be braid into the hat.

3. When blasting, the equipment should be retreated to a safe distance and covered up for protection;

A thorough inspection should be carried out 

4. In case of strong wind and freezing above 6, do not go on the slide frame.If necessary, you must wear a seat belt.It is strictly prohibited to ride on the slewing mechanism or slide frame.







Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.