Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

St-350 Pneumatic Portable Borehole Drilling Machine High Speed Groundwater Resource

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-10 days
Brand: JINZHOU SHITAN
Product Description

ST-350 Pneumatic Drilling Rig High Speed Groundwater Resource Water Well Drilling Rig

 

 

ST 350 Water Well Drilling Rig Introduction:

 

It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on
 

ST 350 Water Well Drilling Rig Technical Data:

 

Product Name ST 350
Power Type Diesel
Place of Origin China
Brand Name SHITAN
Usage Water Well Drilling Rigs
Dimension(L*W*H) 6400MM*2250MM*2700MM
Weight Of Machine 8.9 T
Certification ISO9000
Warranty Time 12 Months
Color  Blue,red ,yellow
Drilling diameter 152mm-305mm
Depth 25M
Rotary speed 0-90rpm
DTH K40
Drilling Rods 76*2m+76*3m
Air consumption 13-20m3/min
Travelling speed
0-2.5km/h


ST 350 Water Well Drilling Rig Main Advantage:

 
1.  five speed manual integrated gearbox, hydraulic release bearing and full synchronizer for gear shifting, with high reliability and long service life;
2. mechanical winch, which has fast lifting speed and is easy to deal with bottom hole accidents.
3. excellent off-road performance, especially in muddy areas.
4. four high-strength hydraulic legs, with a maximum support height of 1.5m, which is convenient for loading and moving of the drilling rig and reduces the hoisting cost. During drilling, the legs can also assist in leveling and stabilize the drilling rig.

 

 

Water Well Drilling Rig Working Process:

 

1. It is necessary to measure the distance during drilling. Generally, drill 10m each time or replace the drill bit, measure the drill pipe once, check the drilling depth, and modify it if necessary. Check whether the gearbox, bushing and vertical shaft gear are overheated and whether there is abnormal sound. If any problem is found, stop in time, find the cause and stop solving the problem.

2. When excavating with clean water, do not supply water before excavation. In addition, water can only be drilled after return. And make sure you have enough traffic. The rock powder in the hole takes a long time. Increase the water volume to prolong the service time of the pump, and wait until before drilling.

3. When replacing drilling tools, Changsha drilling platform is generally required to measure every 10m to change the drilling depth. Even if the gearbox, bushing, vertical shaft gear and other overheating phenomena occur, there will be no abnormal sound. If there is any problem, please stop immediately, investigate the cause and deal with it within a time.

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.