Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Two Hundred Meters Bore Rig Machine 220v Geological Coring

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: Within 7 days
Brand: ShiTan
Product Description
Two Hundred Meters Bore Rig Machine 220V Geological Coring
Product Specifications
Attribute Value
Product Name Two Hundred Meters Depth 220V Soil Sampling Investigation Core Drilling Rig
Color Red Yellow Blue
Feature High Drilling Efficiency
Usage Water Well, Exploration
Application Water Well Drilling
Power Type Diesel
Drilling Depth 200 meters
Warranty 1 Year
Voltage 220V/380V
Length of Drill Pipe 3m
Condition New
Product Overview

The GK 200 Core Drilling Rig is designed for geotectonic survey, geological core drilling, and small hole drillings for grout, blast and water well applications in railway, water conservancy, bridge, dam foundation and other construction projects.

Technical Specifications
Drilling Depth 200m
Maximum Open Hole Caliber 300mm
End Hole Caliber 75mm
Drill Rod Caliber 60mm
Drilling Angle 90°~75°
Drill Weight (Excluding Power) 975kg
Unit Dimensions 1433×697×1273mm
Spindle Speed 64, 128, 287, 557r/min
Spindle Stroke 450mm
Max Single Line Hoisting Capacity 2400kg
Single Line Lifting Speed 0.41, 0.82, 1.64m/s
Steel Wire Rope Caliber 13mm (35m)
Mud Pump Type Horizontal Single Urn Twin-action
Displacement 170/150L/min (diesel or electromotor)
Diesel Engine ZS1115 16.2kw 2200r/min
Electric Motor Y160M-4 11kw 1440r/min
Key Features
  • Hydraulic feeding structure improves drilling efficiency and reduces labor intensity
  • Upper ball clamp clamping mechanism and hexagonal active drill pipe allow rod reversal without shutdown
  • Hole bottom pressure gauge indicates pressure for better hole situation monitoring
  • Centralized handle for easy operation
  • Base-mounted oil cylinder facilitates back-and-forth movement for drilling tool handling
  • Compact structure with small volume, light weight, and strong decomposition for easy relocation
  • Available in trailer type, crawler type, and disassembly configurations for various terrains
Direct Replacement of Drill Pipe

Install locking handles at both ends of the added drill pipe, connect the lifter to the locking handle, lift the drill pipe to the top of the drill hole, connect with the reducer joint, remove the pad fork, lower the drill pipe into the drill hole at uniform speed, block with fork when near inlet, remove elevator and continue drilling.

Exploration Drilling Process

Drilling involves sinking a drill string into the ground while injecting special mud to bring rock fragments and gas samples to the surface. Multiple boreholes are drilled to delineate potential deposits.

Product Images
GK 200 Core Drilling Rig in operation Close-up of drilling rig components Drilling rig setup at worksite Drill pipe and accessories Side view of drilling rig Drilling rig control panel

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.