Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Two Hundred Meters Borehole Pneumatic Drilling Rig Equipment For Deep Hole Blasting

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-10 days
Brand: JINZHOU SHITAN
Product Description
ST 200 Water Well Pneumatic Drilling Rig
Product Specifications
Model Number Truck-mounted drilling rig, crawler mounted drilling rig
Machine Type Drilling Equipment
Hole Diameter Customized
Drilling Depths 200 meters
Weight 8.9 T
Warranty 12 months
Rotation Torque 7500Nm, 983 N.m, 4200N.m, 3400mm
Air Consumption 16-30 M3/min, 20-100m3/min, 17-31m3/min, 16-30cubic meter/min
Color Options Blue, yellow, red
Place of Origin Hebei, China
After Sale Service Video Support
Product Description

The ST 200 large pneumatic drilling rig features an expanded pitch and lifting-arm hydraulic cylinder, making it ideal for water intake in mountainous and rocky strata. This versatile equipment can be used with air compressors, mud pumps, or foam pumps, and requires various drilling tools including drill rods, hammers, and rock drill bits.

Technical Parameters
Model ST 200
Condition New
Type Rotary Drilling Rig
Power Type Diesel
Brand Name Shitan
Usage Water Well Drilling
Dimensions (L×W×H) 6400MM × 2250MM × 2700MM
Weight 5800KG
Drilling Diameter 90-152mm
Depth 25M
Rotary Speed 0-90rpm
DTH K40
Drilling Rods 76×2m + 76×3m
Air Consumption 13-20m3/min
Traveling Speed 0-2.5km/h
Key Features
  • Compatible with both air compressors and mud pumps for different stratums
  • DTH Hammer tools designed for hard layers
  • Crawler mounted base with four hydraulic high standing legs for easy transportation and rugged terrain operation
  • Full hydraulic and top drive technology for labor-saving, efficient operation
  • Integrated diesel engine that can also be used to heat water
Construction Technology for Dewatering Wells

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump installation → trial pumping → normal operation → dewatering completion → pipe pulling → well sealing.

Frequently Asked Questions
Are you a trading company or manufacturer?

We are the factory with our own patent, capable of designing and manufacturing products.

How long is your delivery time?

Standard delivery is 7-10 days for in-stock items, or 15-20 days for custom orders, depending on quantity.

What is your payment method?

30% deposit via T/T, with 70% balance payment before delivery.

What drilling depths are available?

Our water well drilling rigs cover depths from 100m to 600m.

How long could your air compressor be used?

Typically more than 10 years with proper maintenance.

Product Images

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.