300 Meters Mining Drilling Equipment For Soil Testing Samples
Price:
Negotiation
MOQ:
1 set
Delivery Time:
7 days
Brand:
JINZHOU SHITAN
Product Description
GY200 Soil Test Drilling Rig - 300 Meters Mining Drilling Equipment
Product Specifications
| Attribute | Value |
|---|---|
| Product Name | GY200 Soil Test Drilling Rig |
| Drilling Depth | 300 Meters |
| Hole Diameter | Customized |
| Weight | 500kg |
| Voltage | 380v |
| Rated Boring Diameter | 200m |
| Certification | ISO9001 |
| Power Type | Diesel |
| Condition | New |
| Warranty | 1 Year |
Product Overview
The GY200 is a portable multi-purpose engineering survey and construction drilling rig, suitable for geological exploration of industrial, civil buildings, railways, bridges, and hydropower projects, as well as the construction of small-diameter foundation pile holes.
Technical Specifications
| Parameter | Value |
|---|---|
| Borehole diameter | 75,91,110,130,150,300mm |
| Drilling depth | 0-300m |
| Drill pipe diameter | 42,50,60mm |
| Angle range | 0°-360° |
| Size(L*W*H) | 1860*780*1480mm |
| Weight(without power unit) | 900kg |
| Spindle speed(8-speed) | 53,92,145,200,250,435,668,947 r/Min |
| Spindle stroke | 500mm |
| Upward max speed of spindle(no load) | 0.05m/s |
| Downward max speed of spindle(no load) | 0.067m/s |
| Max feeding force of spindle | 36KN |
| Max lifting force of spindle | 49KN |
| Max output torque of spindle | 2500N.m |
Key Features
- Automatic oil pressure feeding mechanism improves drilling efficiency and reduces physical labor
- Ball clamping mechanism replaces traditional chuck
- Equipped with hole bottom pressure gauge for precise pressure monitoring
- Centralized handle design for easy operation
- Compact structure with drilling rig, water pump and diesel engine on single base
- Lightweight with strong decomposability for easy movement in various terrains
- Suitable for general survey, geophysical exploration, and construction projects
- Multiple bit options for different formations (alloy, steel sand, steel particle)
- Capable of drilling sandy clay and bedrock of grade 2-9
Core Drilling Principle
The drilling rig operates by using power from the drill to drive the drill pipe and bit, obtaining deep core samples. Different rig types are available for various depths and strata.
Operation Guidelines
Installation: Prepare rock drilling cavern with appropriate dimensions (2.6-2.8m height for horizontal holes, 2.5m width for vertical/inclined holes). Install air/water pipelines and lighting. Securely erect columns with proper padding.
Pre-Operation Check: Verify all connections for leaks, check oil levels, ensure all fasteners are tight, and confirm column stability.
Drilling Procedure: Start motor, apply proper propulsion force, engage impactor, maintain proper air/water mixture. For continuous operation, reverse motor to disconnect/connect drill pipes as needed.
Product Images
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jinzhou City Shitan Machinery Equipment CO. LTD.
Location
Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person
Anna