Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Portable Mining Survey Engineering Drilling Rig 300mm Hole Diameter 200 Meters Depth

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: Within 7 days
Brand: ShiTan
Product Description

Sample Collecting Gk 200 Engineering Drilling Rig

 

 

GK 200 Engineering Drilling Rig  Introduction

 

GK 200  is equipped with bottom hole pressure gauge to indicate the pressure, which is convenient to master the situation in the hole. The handle is centralized and easy to operate. 


GK 200 Engineering Drilling Rig Information

 

Drilling Depth
200m
Maximum open hole caliber 300mm
End hole caliber 75mm
Drill rod caliber 60mm
Drilling angle 90°~75°
Drill weight (No include power) 975kg
Unity machine dimensions 1433×697×1273m
Spindle
spindle speed 64 128 287 557r/min
Spindle stroke 450mm
Winch
Max.single line hoisting capacity 2400kg
Single line lifting speed 0.41,0.82,1.64m/s
steel wire rope caliber 13m(35m)
Mud pump
Type Horizontal single urn twin-action
Displacement
170/150L/min(diesel or electromotor)
Diesle engine ZS1115 16.2kw 2200r/min
Electric motor Y160M—4 11kw 1440r/min

 

GK 200 Engineering Drilling Rig Features

 

1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.

1.2 Geological core drilling, physical prospecting.

1.3 Small grout Confucius, drill hole drilling.

1.4 Small well drilling.

 
GK 200 Engineering Drilling Rig  Application

 

Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.

With hydro-automatic feeding device, and high drilling efficiency.Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.Close levers, convenient to operate, safe and reliable operations.Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.

 

Precautions for courtyard drilling

 

1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.

 

 

 

 

 

 


 


 
 
 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Contact Person Anna

Request A Quote

Please check your email address.
Your message must be at least 20 characters.