Changzhou Vic-Tech Motor Technology Co., Ltd.
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Price Negotiable
Price: $11~$32/Unit
MOQ: 1Unit
Delivery Time: 15-30 work days
Brand: VIC-TECH
Product Description

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

VSM20A-48S is 20mm diameter linear stepper motor with 135mm length extra long trapezoidal lead screw. The length of lead screw is adjustable.

Besides lead screw, motor’s resistance, step angle can all be customized.

Customers can adjust all the parameters based on their own requirement.

 

Screw lead determines motor’s linear speed and thrust, with longer lead, motor has higher linear speed, with smaller linear pushing force/thrust.

We have two different types of step angle, including 7.5° and 15°/step.

With higher rated voltage, motor has higher coil resistance, and it depends on customer’s power supplier and driver parameters.

 

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

 

Plus tt has extra low noise and high stability.

Design Layout (Unit:mm)

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 20mm
Rated power 3.4W
Rated voltage 12V DC
Phase current 160mA/pahse
Phase resistance 74.5Ω/phase
Phase inductance 36 mH/phase
Step angle 7.5°/step
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 135 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

 

Chart of Thrust vs speed(PPS):

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Changzhou Vic-Tech Motor Technology Co., Ltd.
Location No.28,Shunyuan Road,Xinbei Dist,Changzhou,Jiangsu,China(Mainland)
Contact Person Kangtai Lee

Request A Quote

Please check your email address.
Your message must be at least 20 characters.