HEBEI SOOME PACKAGING MACHINERY CO.,LTD
                                                                                                           
Verified Supplier
31 Years
Since 1995
Menu
Machinery Packaging Machine Other Packaging Machines

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc

Price Negotiable
Price: Contact
MOQ: 1Set
Delivery Time: 45 Days /30 Days
Brand: SOOME
Product Description

Computer-controlled,Automatic change order,Precise cutting NC Thin Blade Slitter Scorer

1 . Summarize

 

Product overview:As an important equipment of corrugated cadres,complete the high quality line of cardboard and precise cutting and the size is very precise.Adopt computer-controlled,automatic change order,and reduce waste,improve work efficiency.

 

2 .  Features

 

1) High quality touch screen and PLC equipped composing the CNC system,connect to the production line.

2) High quality beeline rail and high-precision screw conveying guarantees the precision.

3) A memory of orders,realize non-stop automatic or manual change.

4) Speed synchronizes with board speed.Standard communication interface,easy to link with management system.

5) Alloyed steel thin-blades,sharp and long life of over 8 million meters,auto sharpening.

6) The knife for computer control automatic or manual knife sharpening,edge trimming knife,improve production efficiency.

7) Three types of scorers:convex to concave(three lines).convex to concave(five lines),convex to flat.

8) Two rows of scorers,realizes minimum scorer spacing is 0mm.

9) Computer control score-depth,high quality scorer,more steady.

10) Using the synchronous belt transmission ,low noise,prolong using time.

11) Standard motorized body left-right rectification system 200mm.

 

3. Technical index

 

 

width 1800mm 2200mm 2500mm
speed 150,200,250m/min
Blade&scorer 5&8,6&10,7&12
Order change

1-3s(servo type)

3-8s(invert type)

precision ±0.5mm
Min.slitting 135mm
Min.scorer 0mm
Correction range

200mm

power

25kw

30kw 35kw
machine size

3900*1800*2450 (mm)

4300*1800*2450(mm) 4500*1800*2450(mm)

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HEBEI SOOME PACKAGING MACHINERY CO.,LTD
Location East of 104 National Road,Dongguang County,Cangzhou City,Hebei Province,China
Contact Person Angie Guo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.