CF8 CF3 Stainless Steel Cryogenic Swing Check Valve DN10-100mm PN40MPa for LNG Systems
Price:
USD100 PER PC
MOQ:
1PC
Delivery Time:
5-8 DAYS
Brand:
CNLN
Product Description
CF8/CF3 Stainless Steel Cryogenic Swing Check Valve
High-performance cryogenic check valve designed for LNG, LO2, LN2, and LAr applications. Features rustproof stainless steel construction with straight-through butterfly design for reliable backflow prevention in industrial cryogenic systems.
Key Features
- Stainless steel construction (CF8/CF3) for corrosion resistance
- Cryogenic temperature compatibility for LNG applications
- Straight-through butterfly design for minimal flow resistance
- Automatic operation - opens with flow, closes with reverse flow
- Stainless steel sealing surfaces for durable performance
Technical Specifications
| Parameter | Specification |
|---|---|
| Valve Type | Check Valve |
| Connection Type | Welding |
| Nominal Diameter | DN10mm to DN100mm |
| Nominal Pressure | PN40.0MPa |
| Material Composition | Valve Body: CF8; Valve Disc: 06Cr19Ni10; Valve Stem: 06Cr19Ni10; Stuffing: PTFE; Disc Sealing: PCTFE |
| Suitable Medium | LO2, LN2, LAr, LNG, etc. |
| Design Standard | GB/T24925-2010 |
| Testing Standard | GB/T13927-2008 |
Operation Principle
The valve disc slides along the vertical centerline of the valve body. When medium flows in the designated direction, the valve disc opens via medium pressure. When flow stops or reverses, the disc automatically closes against the valve seat, preventing backflow. The straight-through design minimizes flow resistance while maintaining reliable sealing.
Product Images
Application Examples
Packaging & Delivery
Lead Time & Customization
Standard valves: 5 days delivery. Customized valves: 30-45 days production time. Custom orders require 30% advance payment and detailed specifications including structure length, connection type, nominal diameter, and application requirements.
Installation Guidelines
- Ensure pipes are clean before installation
- Align valve arrow direction with fluid flow
- Maintain cleanliness during installation (valves are pre-degreased)
- Open all valves after pipeline construction to remove debris
- Operate valves slowly during initial use
- Replace worn components (disc, seat, stem) promptly
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
SiChuan Liangchuan Mechanical Equipment Co.,Ltd
Location
No.789,Baiyun Road,East Industrial Park,Xindu District,Chengdu City,Sichuan Province P.C. 610500
Contact Person
Doris