42KW Industrial Shower Test Line for Buses and Cars | 15000×5500×5000mm Internal Dimensions | 625 Nozzles
This 42KW shower test line is designed for comprehensive water testing of buses, cars, trains, and other large vehicles. The system features robust construction and precise control systems for reliable performance in industrial testing environments.
| Parameter | Specification |
|---|---|
| External Dimensions | 15550×8400×5800mm (L×W×H) |
| Internal Dimensions | 15000×5500×5000mm (L×W×H) |
| Room Body Structure | Square steel construction |
| Side Wall Thickness | 70mm EPS panel with 0.5mm color steel |
| Roof Panel Thickness | 50mm EPS panel with 0.5mm color steel |
| Door Structure | 70mm EPS sandwich wall panel, aluminum rim, 4 fold-style doors with glass windows |
| Door Dimensions | 4000×4500mm (W×H) |
| Total Power | 42KW |
| Control Voltage | 220V/50HZ |
- Illumination Level: 400 LUX
- Lighting Quantity: 8 sets × 2 pieces × 40W explosion-proof lights (Philips)
- Protection Rating: IP65
- Spray Area Dimensions: 14000×4900×4500mm (L×W×H)
- Spray Pipe Arrangement: Left, right, up, front and back coverage
- Spray Pipe Distance: 500mm spacing
- Spray Pipe Material: Galvanized steel
- Nozzle Quantity: 625 pieces
- Nozzle Pressure: 2.0 bar
- Control Style: Switch-based control system
- Total Power Consumption: 42KW
- Operating Voltage: 220V/50HZ
We offer comprehensive customization services and professional solutions tailored to specific customer requirements. This system was originally developed for a water test booth project in South China's vehicle industry.
JingzhongJing (JZJ) Group, established in 1999, specializes in design, manufacturing, sales, and service for pre-treatment systems, painting lines, and exhaust gas treatment equipment.
- Main Products: Spray booths, preparation rooms, water testing lines for various vehicles, sand blasting rooms, shot blasting rooms, powder coating systems, painting lines, and VOC treatment equipment
- Production Bases: Guangzhou (since 1999) and Jiangsu (since 2007)
- Turn Key Project: Complete design, manufacturing, installation, debugging, and personnel training services
- Equipment Supply: Equipment provision with onsite installation guidance
- Other Cooperation: Flexible arrangements based on customer needs
- Technical support and production line upgrades
- 12-hour response time for service requests
- Free training with user-friendly English manuals and operation videos
- On-site training and installation available upon request
- Guaranteed on-time delivery
- One-year warranty on all equipment
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.