Zhengzhou Hengyang Industrial Co., Ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

280TPD Suspension Preheater for Cement Production - 5-Stage Cyclone System with Pulverized Coal Fuel

Price Negotiable
Price: 71600-98200USD/Set
MOQ: 1 Set
Delivery Time: 30-40 days
Brand: hengyang
Product Description
Pulverized Coal Cement Preheating 280TPD Suspension Preheater
The suspension preheater serves as the primary heat exchange device in dry process rotary kiln systems, facilitating efficient thermal transfer between dry raw meal and hot air flow from the rotary kiln.
Primary Functions
This equipment maximizes thermal efficiency by utilizing hot gas streams from the rotary kiln and calciner to preheat raw materials and initiate carbonate decomposition. The system enables complete preheating and decomposition processes within the rotary kiln and calciner, ultimately achieving optimal clinker firing conditions.
Key operational capabilities include:
  • Effective gas-solid phase dispersion
  • Rapid heat transfer mechanisms
  • High-efficiency separation technology
These functions collectively enhance overall system efficiency while establishing conditions for superior quality, high productivity, and reduced energy consumption.
Technical Specifications
Equipment Name Model Specification Clinker Production (t/d) Fuel Type
Five-stage cyclone cyclone HRX5/280 280 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRX5/300 300 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/500 (KSV-5) class 500 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/600 (KSV-5) class 600 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/800 (KSV-5) level 5 800 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/1000 (KSV-5) level 5 1000 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/1200 (N-MFC) level 5 1200 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/1200 (DD furnace) level 5 1200 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/1800 (RSP) Level 5 1800 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/2000 (KSV-5) level 2000 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/2500 (KSV-5) level 5 2500 Pulverized coal, natural gas, heavy oil
Five-stage cyclone cyclone HRF5/2500 (DD furnace) level 5 2500 Pulverized coal, natural gas, heavy oil
Industrial suspension preheater system for cement production with multiple cyclone stages

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhengzhou Hengyang Industrial Co., Ltd
Location 500m West, Cross road of Rizhao and Industrial Road, Mazhai Industrial Zone, Zhengzhou City, China
Contact Person Gary

Request A Quote

Please check your email address.
Your message must be at least 20 characters.