Galvanized Cast Iron ERW Structural Steel Sections For Parking Structure

Price Negotiable
Price: $450.00 - $650.00 / Ton
MOQ: 3 Tons
Delivery Time: 1-10T - 7Days, 11-25T - 10Days, 26-100 - 10Days, > 100-To be negotiated
Brand: DZSICO
Product Description

Galvanized Carbon Steel Cast Iron Steel Structural Pipe Fittings For Parking Structure, Sizes, Grade

The products of DZ Steel include ERW pipes, galvanized steel pipes, seamless pipes, petroleum casing tubes, spiral welded pipes, square hollow section, HengJi have strictly implemented the ISO9001-2008 management system .The high efficiency management and finest quality of raw material ensure that the quality of DZ's products is always among the best in the industry.

Structural pipe sizes

Size

OD

20*20-500*500

Wall Thickness

1.2mm-15mm

SCH30,SCH40,STD,XS,SCH80,SCH160,XXS etc.

Length

Length can be customized,Maximum 12M

Steel material

Q195 → Grade B, SS330,SPHC, S185

Q215 → Grade C,CS Type B,SS330, SPHC

Q235 → Grade D,SS400,S235JR,S235JO,S235J2

Q345 → SS500,ST52

Standard

BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,

BSEN10217,GB/T13793-1992,GB/T14291-2006 GB/T3091-1993,

GB/T3092-1993,GB3640-88

Usage

Used For Structure, Construction, Accessorize

Ends

1) Plain

2) Beveled

3) Thread with Coupling or cap

4) Puch holes as per customer's request ,etc.

End protector

1) Plastic pipe cap

2) Iron protector

Inspection

With Hydraulic Testing, Eddy Current , Infrared Test

Package

1) Bundle

2) In Bulk

3) Water proof plastic wrap.

4) As per Client's Requirements

Port of Shipment

Xingang Port,Tianjin, China

Date of Delivery

According To The Quantity And Specification Of Each Orde

 

FAQ:
Q: Are you a manufacturer?
A: Yes , we are a manufacturer, We have own factory, which is located in China.
Q:Can we visit your factory ?
A:Warmly welcome once we have your schedule we will pick you up .
Q: Do you have quality control?
A: Yes, we have gained BV, SGS authentication.
Q:How much about your annual production capacity?
A:Total annual output of 600,000 tons.
Q:Can we get the some samples?Any charges?
A:Yes,you can get available samples in our stock.Free for real samples,but customers need to pay the freight cost.
Q:How about the delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q:How can we get the offer?
A:Please offer the specification of the product,such as material,size,shape,etc.So wecan give the best offer.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company DZ Iron Steel Group
Location 88 Century Dadao, Pudong New Area, Shanghai, China
Contact Person Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.