Guangdong Jingchang Cable Industry Co., Ltd. 
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

GYXTW 2 4 6 Core Fiber Optic Cable With Central Tube Structure

Price Negotiable
Price: Negotiation
MOQ: 1000 Meters
Delivery Time: 7~15Work Day
Brand: OEM/ ODM/ YUEXIANKE
Product Description

GYXTW 2 / 4 / 6 / 8 / 12 / 16 / 24 Core Fiber Optic Cable With Central Tube Structure, Black PE Jacket

Products Description

 

2~24 Core Single Mode Outdoor Armoured GYXTW Fiber Optic Cable

The 250μm fiber is positioned in a loose tube. The tubes are filled with a water-resistant filling compound. The tube is wrapped with a layer of PSP longitudinally. Two parallel steel wires are placed at the two sides of the steel tape. The parallel steel wires are placed at the two sides tape. The cable is completed with a PE cover.

 

Features:

  • Uni-tube gel-filled construction for superior fiber protection.
  • Metallic armor to protect cable from rodent attack and mechanical damage.
  • Embedded steel wire provide desirable tensile strength and crush resistance.
  • Compact, easy to install.
  • UV and waterproof design.

 

Packaging & Shipping

FAQ

Q1: Are you a trading company or manufacturer ?
We are a professional manufacturer that producing communication cable, such as UTP/FTP/SFTP cat5,cat5e,cat6,cat7, patch cord,coaxial cable,power cable,etc. When you have trip in China, feel free to contact us to pick you up in the airport and welcome to visit our factory.

Q2: Why choose us?What is your advantage?
Our factory established in 2011, located in Baiyun district Dongguan City. Produce various cables for more than 9 years experience.You can get quality-assured products and a excellent buying experience from us!

Quality products: High quality raw material
Competitive price: Factory price
OEM service: Offer and welcome OEM service
Thoughtful service : Fast response within 24hours
Quick delivery time: Strict production plan and delivery date.

Q3: Will you accept samples order?
Yes, You are welcome to place sample order to test our superior quality and services.

Q4:Time delivery?
1*20'GP: Within 10 days after receive deposit.
1*40'GP: Within 12 days after receive deposit.
1*40'HQ: Within 15 days after receive deposit.
For Stock items,only 2 days for delivery time.

Q5: Payment term?
T/T, , Money Gram, Paypal, etc.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangdong Jingchang Cable Industry Co., Ltd. 
Location No.319 Liangtian North Road, Zhongluotan Town, Baiyun District, Guangzhou City, Guangdong Province, China
Contact Person Harper

Request A Quote

Please check your email address.
Your message must be at least 20 characters.