Machinery Metal & Metallurgy Machinery Metal Electroplating Machinery

Steel Hard Chrome Plating Machine 0.2um Coating Thickness

Price Negotiable
Price: USD 10000~305000/SET
MOQ: 1 set
Delivery Time: 2~4 months
Brand: SUNTECH
Product Description

1. Technological process of production

Blank inspection → racking → chemical degreasing → water washing → electrolytic degreasing → water washing → Anodizing (in chromium plating bath) → chromium electroplating → recycling → water washing → put down → water washing → drying → inspection → hydrogen removal → packaging

 

2. Main process introduction

Chemical degreasing:remove the oil on the surface of products

Electrolytic degreasing: further remove the oil on the surface of products to ensure the binding force of the coating .

Pickling: remove the oxide from the surface of products and activate the product surface .

Water rinsing: clean the product thoroughly after the tank to avoid mutual contamination of the tank.

Anodizing:Let the surface of the steel substrate be in an activated state and produce micro rough surfaces, and then proceed with plating. Ensure obtaining a hard chromium coating with good adhesion.

Chrome plating: the product is coated with a uniform coating.

Hydrogen removal:reduce the brittleness of chromium plating and clean the hydrogen embrittlement of the base metal.

 

3.Photos

 

4. Solution preparation

Anodizing:           DK              30~50 A/dm2

                              Time             0.5~3mins

 

Chrome plating solution: Cr2O3                          200~250 g/L
                                         H2SO4                         2.0~3.2 g/L
                                         Cr3+                            25-35 g/L
                                        Additives                     16-20 ml/L

                                        Temperature                55~65 ℃

                                        DK                               30~50 A/dm2

 

Hydrogen removal:  Temperature          200~230 ℃

                                 Time                      2~4hours

 

5.Common faults and solutions

 

Common faults Cause of occurrence Solution
Insufficient thickness Insufficient power supply Increase power consumption
Low current efficiency Adjusting plating solution and process parameters
The coating is corrugated and cracked There is stress on the surface of the part Improving the surface machining quality before plating
Heat treatment to eliminate surface stress
Surface burrs High current density Reduce current density
Surface peeling and pitting Inadequate pre-treatment Strengthen pre-treatment

 

 

6.Packaging & Shipping

We can pack it by pallet, or according to the customers' specific requirements.

Port: Shanghai/Ningbo

 

7. Our Services
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
All the electroplating machine of our company have already been widely used in electroplating area.

 

Any doubt please contact us.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hangzhou Suntech Machinery Co, Ltd
Location NO.58, LEITING ROAD. HANGZHOU, CHINA
Contact Person Vivian

Request A Quote

Please check your email address.
Your message must be at least 20 characters.