Cangzhou Xingkui Pipeline Equipment Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

8D Carbon Steel 45 Degree Long Radius Bend

Price Negotiable
Price: Negotiate
MOQ: 1 pc
Delivery Time: 3-10 Days
Brand: YiHang
Product Description

Butt Weld Pipe Fitting 3D 5D 8D Induction Carbon Steel Bend

Product Description:

1. Material: stainless steel,alloy steel,carbon steel

 

2. Size range: FROM 1/2" TO 72"

 

3.Pressure: Sch5--Sch160,XXS

 

4. STANDARDS ANSI, ISO, JIS, DIN, BS, GB, SH, HG, QOST, ETC.

 

5. CE and certification: ISO9001:2000, API, BV, SGS, LOIYD

 

6. Applications range: "Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, water and nuclear power etc.”

BUTT-WELDING PIPE FITTINGS
 
 
 
 
 
 
 
MATERIAL
Carbon Steel:
ASTM, A234WPB, A234WPC, A420WPL6, Q235,10#, A3, Q235A, 20G, 16Mn
DIN St37, St45.8, St52.4, St.35.8, St.35.8.
Stainless Steel:
1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti
00Cr17Ni14Mo2 304 304L 316 316L
Alloy Steel:
16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1,
A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70
STANDARD
ASME/ANSI B16.9, B16.11, B16.28, JIS B2311, B2312, B2312, B2316
ASTM A403 MSS SP-43, SP-83, SP-97
MODEL
1.Tee (Straight and Reducing) 2.180 DEG Return
3.Elbow (45/90/180 DEG) 4.Cap
5. Reducer (Concentric and Eccentric)
TYPE
Seam Or Seamless
ELBOW DEGREE
45 degree, 90 degree, 180 degree
SURFACE
Black Paint, Anti Rust Oil, Hot-Dipped Galvanize
WALL THICKNESS
SCH5S, SCH10S, SCH10, SCH20, SCH30, SCH40, STD, XS, SCH60
SCH80, SCH100, SCH120, SCH140, SCH160, XXS, 2MM
SIZE
1/2"-48"(Dn15-Dn1200)
CONNECTION
Welding
SHAPE
Equal, Reducing
CERTIFICATE
ISO9001 API TUV
APPLICATION
Petrochemical & Gas industry, Power industry, Valve industry, Water works, Shipbuilding industry, Construction etc
Customers’ drawings or designs are available.
PACKAGE
1. 1/2" - 2" in Cartons.
2. Above 2" in Fumigation Wooden Cases.
3. Big size is workable by Pallets.
DELIVERY DETAILS
Normal delivery time is from 15 to 45 days according to the quantities and specifications of each order

used to
Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Location Cangzhou City ,Hebei Province,China
Contact Person Du

Request A Quote

Please check your email address.
Your message must be at least 20 characters.