Cangzhou Xingkui Pipeline Equipment Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

150lbs Carbon Steel Pipe Tee

Price Negotiable
Price: Negotiate
MOQ: 1 pc
Delivery Time: 3-10 Days
Brand: YiHang
Product Description

Aluminium Pipe A105 150lbs Malleable Pipe Fitting Carbon Steel Pipe Tee

Product Description:

 

Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 
Standard: ASTM/JIS/DIN/BS/GB
ASME B16.9, ASME B16.28, MSS SP43, DIN2605,DIN2617,DIN2516,JISB2311,etc; or design as the clients' requests;
Usage:Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

Place of Origin:
HeBei, China
Connection:
Welding
Shape:
round
Head Code:
round
Surface:
Black painting or color painting for carbon steel and alloy steel fittings.
Usage:
Petroleum industry, Refinery Company, fertilizer industry, power station, shipbuilding, onshore platform
Standard:
ANSI B16.9, MSS SP 75, EN10253-2, JIS B2313
Packing:
carton box or wooden case
MOQ:
1 Piece
Size
NPS1/2”-120”(DN15-3000)
Wall Thickness
SCH5S/10S, SCH20/40/80/160, STD/XS/XXS, SGP…….
Standard
ANSI B 16.9/ANSI B16.28/MSS SP43/MSS P75/JIS2311/JIS 2312/JIS2313/DIN2605 /GB-12459/GB-T13401 etc…
we can also produce according to drawing by customers.

Q1: What is your terms of payment?

A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.

Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.

Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.

 

Used To:

 

Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

Advantages And Characteristics:

Manufacter supplis strightly , of good quality and big quantity .

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Location Cangzhou City ,Hebei Province,China
Contact Person Du

Request A Quote

Please check your email address.
Your message must be at least 20 characters.