Guangzhou C.Y. Machinery Parts Trading Co., Ltd.
                                                                                                           
Verified Supplier
27 Years
Since 1999
Menu

4400 ccm 2674A211 C4.4 Engine Turbocharger For E315D2

Price Negotiable
Price: Negotiable
MOQ: 1 PCS
Delivery Time: 1 - 7 Days for stock items, 10-25 days for production order
Brand: HKT SENNUO
Product Description
2674A211 C4.4 Engine Turbocharger for Diesel Engine Turbo E315D2

 

Product Description

 
OE number 2674A211
Description Various
Engine T4.40
Engine Manufacturer OFF Highway
Displacement 4.4L, 4400 ccm, 4 Cylinders
KW 90
RPM Max 2200
Fuel Diesel
Angle α (compressor housing 260°
Angle β (turbine housing) 197°
Bearing Housing 713782-0010 (433275-0002, 433275-0005, 435793-0002, 713782-0002)(Oil Cooling Type)
Turbine Wheel 436563-0003 (436563-0010)(Ind. 54. mm, Exd. 45.72 mm, 12 Blades)
Comp. Wheel 436336-0019 (436563-0002) (Ind. 39.7 mm, Exd. 56. mm, 6+6 Blades, Superback)(1102022408)
Back plate 721086-0001
Heat shield Number 434686-0001
Repair Kit 732252-0001 (1102015756)
Turbine Housing 711739-0001
Compressor Cover 721261-0010
Turbine Housing AR 0.52
Settings waste gate (pressure) 1.250-1.310 bar
Settings Waste gate (lift shaft) 1.00 mm

 

 

 

 

 

 

 

FAQ

 

 

Q. Which countries have you exported?

ASIA: Iraq, UAE, Turkey, Thailand, Malaysia, Indonesia, Vietnam, Bangladesh, Kuwait, Lebanon

EUROPE: Russia, Kazakhstan, Greece, Norway, Ireland

OCEANIA: Australia, Fiji, Kiribati, New Caledonia

AMERICAS: Canada, Jamaica, Brazil, Peru, Chile,

AFRICA: Angola, South Africa, Kenya, Tanzania, Zambia, Sudan, South Sudan, Egypt, Algeri, Nigeria

 

Q: How can I get a quotation?
A: A complete quotation based on the details as follows in your inquiry:
1. Part No. 2.Engine model 3.Machinery model 4. Description and size

Picture. 6.. Quantity 6. Other requirements, such as Packing, Shipping and so on.

 

Q: 4. When can you deliver after sending deposit?
It depends on your order quantity, if we have stock then need about 3~10 working days get it ready, if no stock we will start to produce when the deposite received. Usually it takes 15-60 days for different items.


Q: How do you pack the goods?
We have 20 years experience on export, finished products will be carefully handled by three steps:
1: Wrapped with packing paper or plastic bag;
2: HKT / FUP box or neutral box;
3: Put in an appropriate carton box or wooden boxes and be fixed firmly.

 

Q: How can I know the status of my order?
We will keep you udpate the process of the preparation, to ensure all issues are resolved prior to the delivery.products pictures can be provided if required. We shall send out the goods immediately after confirmation and you will get the tracking information right away

 

Q: How to guarantee your service?

A. Strict inspection during production

B. Strictly check the products before shipment to ensure our packaging in good condition

C. Track and receive feedback from customer regularly

 

Q: What will you do for quality complaint ?

A. We will respond to customer within 24 hours.

B. Our QC will retest the same stock item, if confirmed it is quality problem, we will make corresponding compensation

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou C.Y. Machinery Parts Trading Co., Ltd.
Location Room 408. Junyi Business Building, No.1025 Zhongshan Road Tianhe District, Guangzhou 510660, China
Contact Person Sheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.