Dongguang Lange Equipped Housing Co., Ltd.
                                                                                                           
Verified Supplier
6 Years
Since 2020
Menu

House Prefab Steel Structure For Sport Center Construction

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 90 days
Brand: LANGE
Product Description

Prefab House Steel Structure For Sport Center Construction

here are some additional details about prefab metal steel structures:

 

Design and Fabrication:

Prefab metal steel structures are designed and fabricated using computer-aided design (CAD) software and other advanced technologies. The steel components are cut, drilled, and welded to precise specifications in a factory setting, ensuring high quality and consistency.

 

Assembly:

Once the steel components are fabricated, they are shipped to the construction site and assembled by a skilled team of workers. The assembly process is typically faster and more efficient than traditional construction methods, as the steel components are pre-cut and pre-drilled, which eliminates the need for on-site cutting and other time-consuming tasks.

 

Customization:

Prefab metal steel structures can be customized to meet specific design requirements. They can be designed to accommodate a wide range of building sizes and shapes, and can incorporate various architectural features, such as windows, doors, and skylights. Additionally, they can be customized with a variety of finishes, such as paint, stucco, and brick, to match the surrounding environment.

 

Durability:

Steel is an incredibly strong and durable material, making prefab metal steel structures highly resistant to damage from environmental factors such as wind, rain, and snow. They are also highly resistant to fire, and can withstand earthquakes and other natural disasters better than traditional construction materials.

 

Sustainability:

Prefab metal steel structures are also a sustainable choice for construction. Steel is a recyclable material, which means that it can be reused and repurposed at the endof a building's life cycle. Additionally, the use of pre-fabricated steel components reduces waste and minimizes the environmental impact of construction.

 

Cost:

While the initial cost of prefab metal steel structures may be higher than traditional construction methods, they offer significant cost savings over the life of the building. Steel is a low-maintenance material that requires minimal upkeep, and the speed of construction reduces labor costs and allows for earlier occupancy, which can translate to faster return on investment.

 

No. Item Details of steel structure building or steel frame
1 Material Material carbon structural steel
2 Produce Lead time Normallly 45days after down payment, also according to quantity.
3 Quality Certification Quality certificate from factory, the third party by client request.
4 Dimensions Length H beam: 4000-15000mm
5 Thickness: web plate: 6-32mm
6 wing plate: 6-40mm
7 Height 200-1200mm
8 Color According to customers
9 Size MOQ is 1000 m2, width * length * eave height,

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguang Lange Equipped Housing Co., Ltd.
Location Dongguang County, Cangzhou City, Hebei Province
Contact Person wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.