Wuhan Kingdrilling Diamond Co.,Ltd
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

136mm MK3E127 Overburden Casing Drilling System Bit For Piling,Quarry,Construction,Mining

Price Negotiable
Price: 999-99999USD/PC
MOQ: 1PC
Delivery Time: 3-5WEEKS
Brand: MING
Product Description

Product name: 136mm MK3E127 Overburden Casing Drilling System Bit For Piling,Quarry,Construction,Mining

Casing pipe OD: 127mm

 

Optimal drilling performance in unstable ground conditions. The eccentric bit can be easily and quickly removed for replacement or refurbishment.

 

Our high-performance MK3E Bit, designed for exceptional durability and efficiency. Crafted with the finest quality raw materials, our drill bit undergoes premium hardened procedures, ensuring a long lifespan in the toughest drilling conditions. Trust the MK3E Bit to deliver impeccable performance, unmatched durability, and outstanding value. Experience the difference and elevate your drilling endeavors to new heights.

 

Production details:

 

Technical Parameters
Model Reaming Diameter(mm) Casing Diameter(mm) Equipped Hammer
MK3E108 118 93-99 90
MK3E127 136 115-117 110
MK3E146 152 130-134 110/340
MK3E168 185 148-156 110/340
MK3E178 195 158-166 150/340
MK3E183 196 168-176 350/360
MK3E193 206 176-182 360
MK3E219 236 199-207 360

 

 

Product components:

Pilot bit + middle reamer bit + casing shoe

 

Application:

It can be used in foundation construction, Piling, Water Well and Geothermal, Tunneling and Horizontal drilling. Specially the rock formation is not stable with fractures.

 

Working principle:

1. When drilling starts , the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill bit assembly
2. When the required depth is reached , rotation is reversed carefully, whereupon the reamer swings in , allowing the drill bit assembly to be pulled up through the casing.
3. Casing tubes that are to be left in the drill hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.
4. Drilling continues to the desired depth in the bedrock using a conventional drilling.

 

FAQ:

1. Where does overburden go during a mining operation?
Overburden is used for reprocessing, contouring land, and as a building and road aggregate. Mine tailings are recycled to make clay, tiles, glass, and concrete. Mine water is processed and then used to suppress dust and particulates, as well as for agricultural and industrial purposes and as a coolant.

 

2. What is groundwater drilling?

Basically, a well is a hole drilled into the ground to access water contained in an aquifer. A pipe and a pump are used to pull water out of the ground, and a screen filters out unwanted particles that could clog the pipe.

 

3.Why is overburden important?

Because of the higher temperatures at deeper depths, the overburden rock in a petroleum system sits on top of the source rock and aids in its thermal maturation. The heating rat is influenced by the burial rate, which is determined by the age and thickness of the overlying rock.

 

Products manufacturing:

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Wuhan Kingdrilling Diamond Co.,Ltd
Location 1-2-905 California Sunshine, Optical Valley Street,Wuhan 430074, China
Contact Person Wendy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.