SMC Shower Pan Compression Mold 850T Press Capacity 500000 Shot Lifetime Custom Tooling
Price:
$9000-$100000
MOQ:
1 Set
Delivery Time:
45-60 days for mould
Brand:
UTrust Mould
Product Description
Shower Pan SMC Compression Mold Specifications
| Specification | Detail |
|---|---|
| Material | SMC |
| Steel For Cavity & Core | 1.2344 |
| Mould Base | S50c |
| Number of Cavities | 1*1 |
| Surface Treatment | Chrome |
| Heating System | Thermal oil heating |
| Mould Standard | HASCO |
| Press Machine Capacity | 850T |
| Mould Lifetime | 500,000 shots |
| Manufacturing Time | 35 days |
Compression Mold Manufacturing Capabilities
Industry Applications
- Automotive (cars, trucks, caravans)
- Sanitary (shower bases, bathroom suites)
- Building & Construction (civil engineering, household fixtures)
- Electrical & Electronic (housings, fuses, switchgear)
- SMC door skin molds
Steel Materials Used
| Supplier | Country | Steel Number |
|---|---|---|
| FINKL | USA | P20, H13 |
| Assab | Sweden | S136, S136H, 718H |
| DAIDO | Japan | NAK80, SKD61, PX5 |
| Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
Key Manufacturing Advantages
- Large production capacity (200-300 sets annually)
- Complete in-house process from machining to inspection
- Professional design team with years of experience
- Weekly progress reports with detailed photos
- Steel and heat treatment certification provided
- Spare parts for vulnerable components
- Precision parting lines and high-quality polishing
Quality Assurance & Documentation
Included Documentation
- Tool check-list and assembly drawings
- Steel certifications and dimensions reports
- Mold tryout process sheets
- Part drawings and latest dimensions reports
- CD with 2D & 3D mold drawings and electrode data
Quality Control Process
Professional QC team monitors quality from raw materials through machining to final testing, ensuring top priority to quality standards.
Production Visuals
Service & Support
- 1-year warranty under normal use conditions
- Free spare parts for non-man-made damage
- Quick quotation response within 24 hours
- Free trial samples sent to your country
- Material preparation in advance for timely completion
- Careful packing and shipment preparation
Project Timeline
Typical lead time: 45-60 working days (excluding Chinese holidays) after deposit receipt and approved drawings.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Taizhou Huangyan UTrust Mould Co., Ltd.
Location
Add: No.36, Jinchuan Rd., Beicheng Industrial Area, Huangyan, Taizhou, Zhejiang, China.
Contact Person
Cheng Rex