SMC Compression Mold for Power Pole Arm 300000-1000000 Shots P20 Steel Single-Cavity Design
Price:
$9000-$100000
MOQ:
1 Set
Delivery Time:
45-60 days for mould
Brand:
UTrust Mould
Product Description
Product Overview
Professional SMC compression mold designed for power pole arm manufacturing with exceptional durability and precision engineering.
Technical Specifications
| Attribute | Specification |
|---|---|
| Mold Type | Compression Mold |
| Product Material | SMC |
| Cavity Configuration | Single-cavity |
| Heating System | Oil Heating |
| Demoulding System | Automatic |
| Mold Life | 300,000 - 1,000,000 shots |
| Material | P20 Steel |
| Customization | Available per drawing/sample |
| Warranty Period | 1 Year |
| Lead Time | 60-90 Days |
| Production Capacity | 30 Sets/Month |
Key Features
- Compatible with SMC, BMC, and GMT materials
- High-performance compression molding technology
- Single or multi-cavity configurations available
- Extended operational life of 300,000 to 1,000,000 cycles
- Standard DME/HASCO/LKM components
- Professional export packaging in wooden cases
Manufacturing Capabilities
UTrust Mould specializes in producing high-quality compression molds including SMC, BMC, and GMT variants. With extensive industry experience, we deliver over 30 sets of SMC molds annually to international clients across Australia, Holland, Russia, UK, and other global markets.
Application Industries
- Automotive: Cars, trucks, caravans
- Sanitary Products: Shower bases, bathroom suites
- Building & Construction: Civil engineering fixtures
- Electrical & Electronic: Housings, switchgear components
- Architectural: SMC door skin manufacturing
Quality Assurance & Documentation
Comprehensive quality control throughout manufacturing process with complete documentation package including:
- Tool check-list and assembly drawings
- Steel certifications and dimension reports
- Mold tryout process sheets
- Part drawings and latest dimension reports
- CD with complete 2D & 3D mold drawings
Material Specifications
| Steel Supplier | Country | Steel Numbers |
|---|---|---|
| FINKL | USA | P20, H13 |
| Assab | Sweden | S136, S136H, 718H |
| DAIDO | Japan | NAK80, SKD61, PX5 |
| Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
Technical Visuals
Frequently Asked Questions
Quality Control Process
Our professional QC team monitors mold quality throughout the entire manufacturing process, from raw material inspection to final testing and validation.
Production Lead Time
Standard lead time is 45 to 60 working days (excluding Chinese holidays) after receiving deposit and approving mold drawings.
Sample Approval Options
1) Factory visit for direct mold testing observation 2) Courier sample delivery 3) Mold running videos and dimension inspection reports via email.
After-Sales Service
1-year warranty under normal operating conditions. Free spare parts provided for non-man-made damage within warranty period. Continuous technical support available.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Taizhou Huangyan UTrust Mould Co., Ltd.
Location
Add: No.36, Jinchuan Rd., Beicheng Industrial Area, Huangyan, Taizhou, Zhejiang, China.
Contact Person
Cheng Rex