Single Cavity BMC Compression Mold P20 Steel 300000 Shots for Automotive & Construction Applications
Price:
$9000-$100000
MOQ:
1 Set
Delivery Time:
45-60 days for mould
Brand:
UTrust Mould
Product Description
Product Overview
Single cavity BMC compression mold engineered for 300,000+ production cycles using premium P20 steel construction. Designed for bulk molding compound applications across automotive, construction, and electrical industries.
Technical Specifications
| Parameter | Specification |
|---|---|
| Mold Type | SMC, BMC, GMT Compression Mold |
| Mold Steel Options | P20, 718H, 2738, NAK80 |
| Processing Materials | SMC, BMC, GMT |
| Shaping Method | Compression Molding |
| Industry Standards | DME/HASCO/LKM |
| Cavity Configuration | Single/Multi Cavity |
| Mold Life Expectancy | 300,000 - 1,000,000 shots |
| Production Lead Time | 60 - 90 days |
| Packaging | Standard Export Wooden Case |
Industry Applications
- Automotive: Car components, truck parts, caravan elements
- Sanitary: Shower bases, bathroom suite components
- Building & Construction: Civil engineering, household fixtures
- Electrical & Electronic: Housings, fuses, switchgear
- SMC door skin manufacturing
Manufacturing Capabilities
Production Capacity
200-300 mold sets annually with guaranteed on-time delivery
Quality Assurance
Dedicated plastic mold workshop with comprehensive quality control
Communication Protocol
Weekly progress reports with detailed photos and documentation
Documentation & Certification
- Complete tool check-list and steel certifications
- Steel dimensions report and mold tryout process sheet
- Tool assembly drawing printings and part drawings
- CD containing 2D & 3D mold drawings, electrode data
Steel Material Sources
| Supplier | Country | Steel Grades |
|---|---|---|
| FINKL | USA | P20, H13 |
| Assab | Sweden | S136, S136H, 718H |
| DAIDO | Japan | NAK80, SKD61, PX5 |
| Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
Quality & Service Commitment
- 1-year warranty under normal operating conditions
- Free replacement of non-man-made damaged spare parts
- Professional QC team monitoring from raw materials to final testing
- 45-60 working day lead time after deposit and drawing approval
Product Visualization
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Taizhou Huangyan UTrust Mould Co., Ltd.
Location
Add: No.36, Jinchuan Rd., Beicheng Industrial Area, Huangyan, Taizhou, Zhejiang, China.
Contact Person
Cheng Rex