SMC Train Door Frame Compression Mold P20 Steel 300000 Shots Thermal Oil Heating 35 Day Lead Time
Price:
$9000-$100000
MOQ:
1 Set
Delivery Time:
45-60 days for mould
Brand:
UTrust Mould
Product Description
Product Specifications
| Specification | Details |
|---|---|
| Mould Name | High Strength Fiberglass SMC Mould Train Door Frame Compression Mold |
| Material | SMC (Sheet Molding Compound) |
| Steel For Cavity & Core | P20 Tool Steel |
| Mould Base | S50C Steel |
| Number of Cavities | 1×1 |
| Surface Treatment | Chrome Plating |
| Heating System | Thermal Oil Heating |
| Mould Lifetime | 300,000 shots |
| Lead Time | 35 days |
Manufacturing Capabilities
Specialized Compression Mould Types
- SMC Moulds (Sheet Molding Compound)
- BMC Moulds (Bulk Molding Compound)
- GMT Moulds (Glass Mat Thermoplastic)
Industry Applications
- Automotive: Cars, trucks, caravans
- Sanitary: Shower bases, bathroom suites, hygienic surfaces
- Building & Construction: Civil engineering, household fixtures
- Electrical & Electronic: Housings, fuses, switchgear
- Door Skin Moulds
Quality Assurance & Service
Why Choose Our Compression Moulds
• Extensive design experience with senior professional designers
• Strong production capacity: 200-300 sets annually
• Dedicated plastic mould workshop for quality control
• Weekly progress reports with detailed photos
• Rapid prototypes and low-volume production options
Mould Shipment Documentation
- Tool check-list and assembly drawings
- Steel certifications and dimensions reports
- Mold tryout process sheets
- Part drawings and latest dimensions reports
- CD with 2D & 3D mold drawings and electrode data
Premium Steel Suppliers
| Supplier | Country | Steel Grades |
|---|---|---|
| FINKL | USA | P20, H13 |
| Assab | Sweden | S136, S136H, 718H |
| DAIDO | Japan | NAK80, SKD61, PX5 |
| Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
Frequently Asked Questions
Quality Control Process
Our professional QC team oversees mold quality from raw materials through machining to final testing, ensuring consistent high-quality production standards.
Standard Lead Time
45-60 working days (excluding Chinese holidays) after deposit receipt and mold drawing approval.
Sample Approval Options
- Visit our factory for direct mold testing observation
- We ship samples via DHL/TNT/Fedex with mold running videos and dimension inspection reports
After-Sales Service & Warranty
1-year warranty under normal use conditions with free replacement for non-man-made damaged spare parts. Our technical team provides continuous support.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Taizhou Huangyan UTrust Mould Co., Ltd.
Location
Add: No.36, Jinchuan Rd., Beicheng Industrial Area, Huangyan, Taizhou, Zhejiang, China.
Contact Person
Cheng Rex