QINGDAO HIOUNCE HVAC EQUIPMENT CO.,LTD
                                                                                                           
Verified Supplier
46 Years
Since 1980
Menu

Top Component Wall Hung Boilers Heat Bath Wall Mounted Natural Gas Boilers

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 30days after receiving the deposit
Brand: RENO
Product Description

Gas Wall Mounted Heater White Covering Top Component Copper Heat Exchanger Heat And BathDual Function Boiler

 

 

 

                                     Introduction to gas wall hanging furnace

                                               Gas wall furnace originated in Europe, has a history of hundreds of years, now, because of the European blood wall                                                 furnace has a long history of development, mature technology, good quality and become the market favorite. The                                                     full name of "wall hanging furnace" is: "gas wall hanging heating furnace". It and gas fast water heater are rapid                                                       heating equipment without hot water storage device, but there are essential differences in structure.

                                              Gas wall hanging stove has a powerful family central heating function, can meet the heating demand of multi-room,                                                   in addition, can also take into account the hot water bath function, gas wall hanging stove heating function is                                                             affected by the local climate conditions and building insulation conditions.

                                               Function description of some major accessories:

                                                The function of water flow switch: detect the amount of tap water through, under certain conditions, make the boiler                                                  switch to domestic hot water mode.

                                                The function of the gas valve is to ensure the normal combustion of the boiler. In a certain range of gas pressure,                                                    make the boiler stable combustion and can automatically adjust the gas supply according to the requirements of                                                      the boiler heat output, in order to realize the automatic shutdown of the boiler and gas proportion regulation.

                                               The role of the fan: The exhaust gas produced during combustion is discharged outdoors, and the fresh air outside                                                    is pumped into the combustion chamber, so that the combustion chamber is kept in a state of micro negative                                                            pressure and the flue gas is prevented from spreading indoors.

                                                The function of the main control circuit board: it is used to control the start, stop and constant temperature of the                                                      HVAC equipment.

                                                The role of water pressure switch: In order to ensure the normal operation of the heating system, the system is                                                        filled  with water, and maintain a certain pressure. The water shortage protection can be achieved by detecting the                                                  system pressure through the water pressure switch.

                                                The role of the burner: It can ensure the normal combustion of gas, which from the nozzle high pressure injection                                                    into the burner inside the Venturi tube, causing the pressure in the tube down. Air (the first air) is inhaled and mixed                                                  with gas, Which will rush out gas hole to burn. The air that is still insufficient after the first mixing is partially mixed                                                    by the second mixing of air around the fire to form a complete combustion.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company QINGDAO HIOUNCE HVAC EQUIPMENT CO.,LTD
Location NO.7 LONGRUI ROAD BEIGUAN INDUSTRIAL PARK JIAOBEI STREET OFFICE JIAOZHOU QINGDAO CITY SHANDONG PROVINCE
Contact Person Mr.Chen Zong Hua

Request A Quote

Please check your email address.
Your message must be at least 20 characters.