Electrical Discharge Machining CNC Aluminum Parts For High Train
Price:
USD 5-225/PCS
MOQ:
50 pcs
Delivery Time:
15-20 work days
Brand:
Chenyang
Product Description
Manufacturer Aluminum CNC Machining Parts for High Train
Some of CNC Machining Process:
- Machining Operations:
- The CNC machine executes a series of machining operations, which may include:
- Turning: Rotating the workpiece while a cutting tool removes material to create cylindrical shapes.
- Milling: Using rotary cutters to remove material from the workpiece to create flat or contoured surfaces.
- Drilling: Creating holes in the workpiece using a rotating cutting tool.
- Grinding: Precision grinding operations for achieving tight tolerances and smooth surface finishes.
- EDM (Electrical Discharge Machining): Using electrical discharges to shape or cut the workpiece in cases where conventional machining is not feasible.
- Laser Cutting: Using a high-powered laser beam to cut through material for intricate designs.
- Waterjet Cutting: Employing a high-pressure stream of water mixed with abrasive particles to cut through materials like metals and plastics.
- The CNC machine executes a series of machining operations, which may include:
- Quality Control and Inspection:
- During and after machining, quality control measures are taken to ensure that the part meets design specifications. This may include dimensional measurements, surface finish inspection, and material testing.
| Brand | Chenyang | |
| Our products | Auto spare parts,High-speed Train spare parts,Wind power accessories,communications and security equipment spare parts,Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc | |
| Place of Origin |
|
|
| Size | OEM Standard Size | |
| Surface | Matte or gloss or according to clent's requirement | |
| Process | die casting Cnc maching | |
| Available Materials | AL:5052/5754/5082/5083/6061/6063/6082…. ZL101/ZL102/ADC12… Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D… Stainless steel: 304/316/430/201... |
|
| Payment | T/T, L/C, Money Gram, Western Union | |
| Delivery | Sample: 3~5 days for no mould items and 7~10 days for mould items Mass goods: 15~20 working days |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Qingdao Chenyang Machinery Mfg Co., Ltd.
Location
NO.5 Yunshui 2nd Road, Automobile Industry New Town, Jimo Dirstrict, Qingdao, China
Contact Person
Abby