Qingdao Chenyang Machinery Mfg Co., Ltd.
                                                                                                           
Verified Supplier
19 Years
Since 2007
Menu
Fabrication Services Sheet Metal Fabrication

SGCC Custom Laser Cutting CNC Milling Parts Electroplating

Price Negotiable
Price: US $0.5-1.5/ Piece
MOQ: 20Piece
Delivery Time: Sample: 3~5 days for no mould items and 7~10 days for mould items Mass goods: 15~20 working days
Brand: Chenyang
Product Description

CNC Milling Parts Laser Cutting Bending Forming, Copper/Aluminum/Iron/Stainless Steel Stamping

 

CNC Die Sinking EDM Operation

  1. Material Assessment: Select materials suitable for CNC die sinking EDM, often involving conductive materials like tool steel, carbide, or tungsten.
  2. Electrode Selection: Choose the appropriate electrode material, often made of graphite or copper, and shape it to the desired geometry for the machining task.
  3. Workpiece Fixturing: Securely hold the workpiece in the CNC die sinking EDM machine, ensuring proper alignment with the electrode.
  4. CNC Setup: Configure the CNC machine by loading the specific CNC program, setting tool offsets, work offsets, discharge parameters, and flushing rates.
  5. Die Sinking EDM Process: Activate the CNC machine to initiate electrical discharges between the electrode and the workpiece, eroding material and creating precise, complex cavities or molds as per the programmed instructions.

 

Brand Chenyang
Our products Auto spare parts,High-speed Train spare parts,Wind power accessories,communications and security equipment spare parts,Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc
Place of Origin
Qingdao China (Mainland)
Size OEM Standard Size
Surface Matte or gloss or according to clent's requirement
Process turining milling grinding machining
Available Materials AL:5052/5754/5082/5083/6061/6063/6082….
ZL101/ZL102/ADC12…
Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D…
Stainless steel: 304/316/430/201...
Payment T/T, L/C, Money Gram, Western Union
Delivery Sample: 3~5 days for no mould items and 7~10 days for mould items
Mass goods: 15~20 working days

 

 

 
Related Videos

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Chenyang Machinery Mfg Co., Ltd.
Location NO.5 Yunshui 2nd Road, Automobile Industry New Town, Jimo Dirstrict, Qingdao, China
Contact Person Abby

Request A Quote

Please check your email address.
Your message must be at least 20 characters.