Shandong Sinovis EP Tech Co., Ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Wet Concrete Shotcrete Robot For Efficient Tunnel And Mine Construction Projects

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: 3-8 working days
Brand: ML-3016
Product Description
1. Core Application Scenarios

Tailored to solve the pain points of high-intensity, complex construction environments, the robot is widely used in:

  • Tunnel Construction:

    Suitable for highway tunnels, railway tunnels, and urban subway tunnels – effectively handles concrete spraying for tunnel walls, vaults, and confined curved surfaces.

  • Mine Construction:

    Applicable to underground mine roadways, ore pass support, and goaf filling – adapts to narrow spaces and dusty, humid mine working conditions.

  • Other Heavy-Duty Projects:

    Also used in slope protection engineering, large-scale culvert construction, and underground powerhouse spraying – meets the needs of high-altitude, large-area concrete application.

2. Exceptional Performance for High-Demand Scenarios
  • Efficient Spraying to Speed Up Schedules:

    With high maximum conveying capacity, it can complete the concrete spraying of 50-80㎡ tunnel sections per hour – solves the problem of slow manual operation in tight-schedule tunnel/mine projects.

  • Stable Pressure to Ensure Project Quality:

    Equipped with a powerful pump system, it maintains stable high-pressure delivery of concrete – avoids uneven spraying and hollowing in key parts like tunnel vaults, ensuring structural safety.

3. Outstanding Adaptability to Complex Environments
  • Flexible Robotic Arm for Hard-to-Reach Areas:

    The big boom swings at a 120° angle, and the small boom supports 180° pitch + 1.5m telescopic range – easily reaches the top of 5m-high tunnels or narrow mine roadways (width ≥2.8m) without frequent equipment movement.

  • Strong Environmental Resistance:

    The whole machine adopts dust-proof and waterproof design (IP54 rating) – works normally in mine dust or tunnel water seepage environments, reducing downtime.

4. User-Friendly Operation for Safe Construction
  • Remote Control to Avoid Hazards:

    Supports 50m wireless remote operation – operators can stand outside the tunnel/mine blasting area or toxic dust zone, eliminating the risk of injury from falling rocks or harmful gases.

  • Intuitive Control for Precise Operation:

    The industrial control screen displays real-time parameters (conveying speed, adjuvant dosage, pressure) – even unskilled workers can master it in 1 hour, reducing training costs for construction teams.

5. Durability & Reliability for Long-Term Work
  • Heavy-Duty Chassis for Rough Sites:

    Adopts a reinforced diesel engine (meeting national emission standards) with water cooling system – works continuously for 8 hours in high-temperature (40℃) or low-temperature (-10℃) environments, suitable for long-term tunnel/mine construction.

  • Stable Braking for Site Safety:

    Equipped with heavy-duty pneumatic brakes and anti-slip tires – maintains stable parking on sloped tunnel floors (≤15°) or uneven mine roads, preventing equipment sliding.

6. Practical Attached Equipment for Post-Work Convenience
  • High-Pressure Washer for Quick Cleaning:

    Built-in 30MPa high-pressure water system – cleans the spraying pipeline and nozzle in 10 minutes after work, avoiding concrete solidification and blocking (a common problem in manual cleaning).

  • Adjustable Adjuvant System for Material Adaptability:

    Supports 0-5% adjuvant dosage adjustment – adapts to different concrete materials (e.g., fiber concrete for tunnel support, quick-setting concrete for mine emergency repair), improving construction flexibility.

7. Globally Trusted for Proven Results

Has been successfully applied in major projects:

  • Dominican Republic Highway Tunnel Project:

    Completed 3km tunnel spraying in 2 months, 50% faster than manual operation.

  • Indonesia Underground Mine Support Project:

    Maintained stable operation for 6 months in dusty environments, with zero equipment failures.

  • Mexico Urban Subway Tunnel Project:

    Met the strict quality standards of subway construction, with the sprayed concrete layer passing 100% integrity testing.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Sinovis EP Tech Co., Ltd
Location 5-1-103, New Material Industrial Park, Yunhe Economic Development Zone, Rencheng District, Jining City, Shandong Province. Postcode:272053
Contact Person Sunny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.