Multi Function Wet Concrete Shotcrete Robot For Slope Protection Works
| Parameter Category | Specific Indicators | Industry Adaptation Value |
|---|---|---|
| Spraying Performance | - Max Conveying Capacity: 8 m³/h - Spraying Pressure: 16 MPa - Material Utilization Rate: ≥95% |
Meets the high-efficiency construction needs of 50-80㎡ tunnel sections per hour; reduces material waste in mine backfilling projects |
| Robotic Arm Flexibility | - Boom Swing Angle: 120° - Boom Telescopic Range: 1.5 m - Max Working Height: 5 m |
Covers tunnel vaults (height ≤5 m) and narrow mine roadways (width ≥2.8 m); no need for frequent equipment movement |
| Operation & Control | - Remote Control Distance: 50 m - Control Mode: Wireless + Manual - Parameter Display: 7-inch Industrial Screen |
Ensures operator safety in high-dust/mine blasting areas; real-time monitoring of spraying speed/pressure |
| Environmental Adaptation | - Protection Grade: IP54 - Working Temperature: -10℃ ~ 40℃ - Dust Resistance: ≥90% |
Stable operation in humid tunnel seepage or dusty mine environments; suitable for multi-climate construction |
| Power & Durability | - Engine Type: National Standard Diesel - Fuel Consumption: 8 L/h - Nozzle Service Life: 5000 h |
Complies with environmental regulations; low long-term energy costs; reduces vulnerable part replacement frequency |
| Auxiliary Functions | - Admixture Adjustment Range: 0-5% - Cleaning System: 30 MPa High-Pressure Water - Emergency Stop: Dual-Button Design |
Adapts to fiber/quick-setting concrete; 10-minute post-work cleaning; rapid shutdown in dangerous situations |
Based on the above parameters, the wet concrete shotcrete robot solves key pain points in the construction industry:
High-Efficiency Construction: With a max conveying capacity of 8 m³/h, it shortens the construction period of a 3km tunnel by 30% compared to manual spraying, which is especially suitable for tight-schedule highway and subway tunnel projects.
Wide Adaptability: The 5m max working height and 120° boom swing angle enable it to handle tunnel vault spraying and mine roadway support without additional lifting equipment, reducing on-site coordination costs.
Low Operation Risk: The 50m remote control distance keeps operators away from falling rocks and toxic gases in mines; the IP54 protection grade ensures no equipment failure due to dust or water seepage, improving construction safety.
Cost Reduction: The ≥95% material utilization rate saves 20% concrete costs for mine backfilling projects; the 5000h nozzle service life reduces vulnerable part replacement expenses by half compared to ordinary equipment.
Global Compliance: The national standard diesel engine meets emission requirements of the EU, Southeast Asia, and other regions, and has been successfully applied in Indonesia's nickel mine projects and Mexico's subway projects.